Document Title [English] : Design and Construction for Ground Improvement - Code of Practice : Part 2 Preconsolidation Using Vertical Drains
Document Title [Hindi] : भूमि सुधार के लिए डिजाइन और संरचना - रीति संहिता : भाग 2 ऊर्ध्वाधर नालियों का उपयोग करके पूर्व-समेकन
Document Type : Revision
Language : English
Priority : 3
ICS Code : 93.020
Date of Project Approval : 09-11-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 15284 : Part 2: 2004
2 IS 15284 : Part 2: 2004
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Foundation, underground structures, soil and rock mechanics
Sub Sub Group : Foundation Engineering
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title : Ground improvement by pre-consolidation using vertical drains
ITCHS Code :
Ministry :
  • Ministry of Housing and Urban Affairs
  • Ministry of Commerce and Industry
  • Ministry of Power
  • Ministry of Petroleum and Natural Gas
  • Ministry of Jal Shakti
  • Ministry of Ports, Shipping and Waterways
  • Ministry of Road Transport and Highways
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 It covers provisions on design and construction of vertical drains used for improving the ground such that the consolidation under preload is accelerated resulting in improvement of ground to carry envisaged loads.
2 a) The standard was previously brought out as a guideline standard as the experience of ground improvement techniques in the country was limited. With lot of experience gained over the years, it has been decided to bring out the revised standard as a code of practice standard. The title of the standard has been changed accordingly. b) Definitions of various terms have been modified as per the prevailing engineering practice. c) Quality control and test requirements for prefabricated vertical drains have been incorporated. d) Smear effect has been included in design procedure. e) The factor of safety against possible slip or bearing failure has been reduced to 1.2 to be consistent with other Indian standards. f) Vacuum consolidation method has been included. g) Instrumentation and monitoring has been included.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 22-12-2023 22-05-2024 06-08-2024 21-12-2024 MADHURIMA MADHAV 22-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 09-11-2023 -------
2 P-Draft Waived 22-12-2023 -------
3 WC Draft 23-12-2023 Duration : 40 Days
Submitted for HOD approval
-------
4 WC Draft 23-12-2023 WC approved by HOD
CEDC  CED 43, CED 48, CED 39, -------