Document Details
Name of Department/Committee : ETD 09
Document Number : ETD 09 ( 24441)
Document Title [English] : Aerial bunched cables for working Voltages up to and including 1 100 volts - Specification (First Revision)
Document Title [Hindi] : 1 100 वोल्ट तक और इसमें शामिल वोल्टेज पर काम करने के लिए एरियल बंच्ड केबल - विशिष्टता (पहला पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 1
ICS Code : 29.060.20
Date of Project Approval : 14-12-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 14255: 1995
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 14255: 1995


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Cables, Conductors, Wires and Accessories
Sub Sub Group : Power cables
Aspects : Product Specification
Risk : High
Certification : Mandatory Certification
Short Commom Man's Title : ABC cable
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • SUSTAINABLE CITIES AND COMMUNITIES
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This Indian Standard is revised to meet the various constructions of Aerial Bunched Cables in demand. The changes and additions made in this standard are - a) Cable sizes up to 185 sq. mm covered. b) Thickness of insulation for insulated Al alloy messenger is defined c) For weather resistance of insulation, carbon content is defined and test method as per IS: 10810 (Part 32) included. d) Sampling plan for acceptance test is revised. e) Revision of marking including printing/embossing etc. as per current practice.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 14-12-2023 14-03-2024 14-04-2024 14-06-2024 MOHAMMAD ISRAFIL 14-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 14-12-2023 -------
2 P-Draft 14-12-2023 Covering letter generated -------
3 P-Draft 14-12-2023 Duration : 30 Days ETD 9, -------
4 Skipped to W-Draft 05-07-2024 Stage-Changed -------
5 WC Draft 05-07-2024 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 05-07-2024 WC approved by HOD
ETDC   -------