Name of Department/Committee : | ETD 09 | ||||
---|---|---|---|---|---|
Document Number : | ETD 09 ( 24441) | ||||
Document Title [English] : | Aerial bunched cables for working Voltages up to and including 1 100 volts - Specification (First Revision) | ||||
Document Title [Hindi] : | 1 100 वोल्ट तक और इसमें शामिल वोल्टेज पर काम करने के लिए एरियल बंच्ड केबल - विशिष्टता (पहला पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 1 | ||||
ICS Code : | 29.060.20 | ||||
Date of Project Approval : | 14-12-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Electrical Switchgear and Other Electrical Products/Accessories |
Sub Group : | Cables, Conductors, Wires and Accessories |
Sub Sub Group : | Power cables |
Aspects : | Product Specification |
Risk : | High |
Certification : | Mandatory Certification |
Short Commom Man's Title : | ABC cable |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This Indian Standard is revised to meet the various constructions of Aerial Bunched Cables in demand. The changes and additions made in this standard are - a) Cable sizes up to 185 sq. mm covered. b) Thickness of insulation for insulated Al alloy messenger is defined c) For weather resistance of insulation, carbon content is defined and test method as per IS: 10810 (Part 32) included. d) Sampling plan for acceptance test is revised. e) Revision of marking including printing/embossing etc. as per current practice. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 14-12-2023 | ------- | ||
2 | P-Draft | 14-12-2023 | Covering letter generated | ------- | |
3 | P-Draft | 14-12-2023 | Duration : 30 Days | ETD 9, | ------- |
4 | Skipped to W-Draft | 05-07-2024 | Stage-Changed | ------- | |
5 | WC Draft | 05-07-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 05-07-2024 | WC approved by HOD |