Document Details |
|||||
Name of Department/Committee : | MTD 08 | ||||
---|---|---|---|---|---|
Document Number : | MTD 08 ( 24431) | ||||
Document Title [English] : | Copper plate sheet strip and foil for electrical purposes - Specification (Fourth Revision) | ||||
Document Title [Hindi] : | विद्युत प्रयोजनों के लिए तांबे की प्लेट शीट पट्टी और पन्नी - विशिष्टता (चौथा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 1 | ||||
ICS Code : | 77.120.30 | ||||
Date of Project Approval : | 13-12-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Metals, Alloys and Metal Products (including Steel Products) |
Sub Group : | Non ferrous metals and their alloys |
Sub Sub Group : | Copper |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Mandatory Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | scope of the standard has been modified to cover copper plate, sheet and foil (see 1); | |
2 | terminologies for plate, sheet and foil have been added and thickness of strip has been modified (see 3); | |
3 | clause on condition of supply has been updated (see 5); | |
4 | Table 1 for chemical composition has been added (see 6); | |
5 | edgewise bending test has been removed; and | |
6 | clause on optional test for controlled proof resistance has been removed |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 13-12-2023 | ------- | ||
2 | P-Draft | 13-12-2023 | Covering letter generated | ------- | |
3 | P-Draft | 13-12-2023 | Duration : 30 Days Remarks : For your kind inputs and comments please |
MTD 8, MTD 08, | ------- |
4 | Skipped to W-Draft | 12-09-2024 | Stage-Changed | ------- | |
5 | WC Draft | 12-09-2024 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 13-09-2024 | WC rejected by HOD Remarks: Please modify as discussed |
------- | |
7 | WC Draft | 13-09-2024 | Duration : 30 Days Submitted for HOD approval Remarks : The document has been modified as discussed |
------- | |
8 | WC Draft | 13-09-2024 | WC approved by HOD |
MTDC | ------- |