Document Details
Name of Department/Committee : MTD 08
Document Number : MTD 08 ( 24431)
Document Title [English] : Copper plate sheet strip and foil for electrical purposes - Specification (Fourth Revision)
Document Title [Hindi] : विद्युत प्रयोजनों के लिए तांबे की प्लेट शीट पट्टी और पन्नी - विशिष्टता (चौथा पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 1
ICS Code : 77.120.30
Date of Project Approval : 13-12-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 1897: 2008
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 1897: 2008


Classification Details
Group : Metals, Alloys and Metal Products (including Steel Products)
Sub Group : Non ferrous metals and their alloys
Sub Sub Group : Copper
Aspects : Product Specification
Risk : Low
Certification : Mandatory Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 scope of the standard has been modified to cover copper plate, sheet and foil (see 1);
2 terminologies for plate, sheet and foil have been added and thickness of strip has been modified (see 3);
3 clause on condition of supply has been updated (see 5);
4 Table 1 for chemical composition has been added (see 6);
5 edgewise bending test has been removed; and
6 clause on optional test for controlled proof resistance has been removed

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 13-12-2023 13-03-2024 13-04-2024 13-06-2024 Mr. Vishal Kumar Rana 13-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 13-12-2023 -------
2 P-Draft 13-12-2023 Covering letter generated -------
3 P-Draft 13-12-2023 Duration : 30 Days
Remarks : For your kind inputs and comments please
MTD 8, MTD 08,  -------
4 Skipped to W-Draft 12-09-2024 Stage-Changed -------
5 WC Draft 12-09-2024 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 13-09-2024 WC rejected by HOD
Remarks: Please modify as discussed
-------
7 WC Draft 13-09-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : The document has been modified as discussed
-------
8 WC Draft 13-09-2024 WC approved by HOD
MTDC   -------