Document Details
Name of Department/Committee : PGD 36
Document Number : PGD 36 ( 24420)
Document Title [English] : Hydraulic Fluid Power Dimensions and Requirements of Quick-Action Couplings Part 1 Dimensions and Requirements
Document Title [Hindi] : द्र्वचालित तरल शक्ति — शीघ्रकार्य युग्मन की आयाम और अपेक्षायें भाग 1 आयाम और अपेक्षाय
Document Type : Revision
Language : English
Priority : 3
ICS Code : 23.100.40
Date of Project Approval : 24-08-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13614 : Part 1: 1995
Standards to be Superseded :


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Hand tools and machine components
Sub Sub Group : Hydraulic Fittings Tee, elbow,hoses etc.
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 7241:2023
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies the interface dimensions and basic performance requirements for two series of hydraulic quick-action couplings. Both series are in widespread use and have similar technological advantages: — Series A is used predominantly in Europe and is preferred worldwide for agricultural and forestry machinery. This document specifies additional requirements for Series A for use in the agricultural machinery applications given in ISO 5675. — Series B is used predominantly in North America and in the chemical industry
2 The major changes in this revision are as follows: a) Nominal size designations 20, 40, 50 have been replaced by 19, 38, 51 in accordance with ISO 4397; b) Impulse pressure test type has been added in accordance with IS 443 (Part 6); c) A mistake in Table 7 has been corrected (two values were inverted); and d) Minor graphical updates have been made.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 11-12-2023 11-05-2024 26-07-2024 11-12-2024 Mr. MONARCH JOSHI 11-12-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 24-08-2023 -------
2 P-Draft Waived 09-01-2024 -------
3 WC Draft 09-01-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : Correction have been made as marked in the hard copy Submitted for your kind approval please
-------
4 WC Draft 09-01-2024 WC approved by HOD
PGDC   -------