Document Details
Name of Department/Committee : PCD 18
Document Number : PCD 18 ( 23365)
Document Title [English] : OIL OF CITRONELLA JAVA SPECIFICATION
Document Title [Hindi] : OIL OF CITRONELLA (JAVA) — SPECIFICATION
Document Type : Revision
Language : English
Priority : 3
ICS Code : 71.100.60
Date of Project Approval : 22-08-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 512: 1988
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 512: 1988


Classification Details
Group : Household Products Appliances(non-electrical)
Sub Group : Cosmetics and body care products
Sub Sub Group : Natural and synthetic fragrance materials
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Agriculture
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Oil of citronella (Java) is one of the most important essential oils used in perfumery industry. It acts as main starting material for the production of numerous important perfumery materials such as geraniol, citronellal and their derivatives. The oil as such also finds extensive use in perfumery, various household cleaners, technical products, insecticides, etc.
2 In this (third) revision, the gas chromatographic method has been upgraded from Packed Column GC to Capillary Column GC for more accurate results, which are being progressively used in the country. Besides, the values for Optical Rotation, Refractive Index and Relative Density have been reported at 20°C in addition to 27°C in order to facilitate international trade, since the fragrance and flavor ingredients are traded at international level quoting the Optical Rotation, Relative Density and Refractive Index at 20ºC rather than at 27ºC as prescribed in the Indian standards. The requirement for Flash Point has also been incorporated in this revision.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 25-08-2023 25-01-2024 09-04-2024 24-08-2024 Mr. SOURAV MONDAL 25-08-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 22-08-2023 -------
2 P-Draft Waived 25-08-2023 -------
3 WC Draft 25-08-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 25-08-2023 WC approved by HOD
PCDC   -------