Document Details
Name of Department/Committee : PCD 27
Document Number : PCD 27 ( 23190)
Document Title [English] : PLASTICS METHODS OF TESTING PART 4 RHEOLOGICAL PROPERTIES SECTION 1 DETERMINATION OF THE MELT MASS-FLOW RATE MFR AND THE MELT VOLUME-FLOW RATE MVR OF THERMOPLASTICS
Document Title [Hindi] : PLASTICS — METHODS OF TESTING PART 4 RHEOLOGICAL PROPERTIES SECTION 1 DETERMINATION OF THE MELT MASS-FLOW RATE (MFR) AND THE MELT VOLUME-FLOW RATE (MVR) OF THERMOPLASTICS
Document Type : Revision
Language : English
Priority : 3
ICS Code : 83.080.20
Date of Project Approval : 31-05-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13360 : Part 4 : Sec 1 : SubSec 1: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13360 : Part 4 : Sec 1 : SubSec 1: 2018


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Plastic Films, Bottles, Jars, Pipes, Sockets and Other Products
Sub Sub Group : Method of test for plastics
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals (DCPC)
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 1133-1 : 2022
Organization Type: ISO

Sl.No. Synosis Points
1 This document specifies two procedures for the determination of the melt mass-flow rate (MFR) and the melt volume-flow rate (MVR) of thermoplastic materials under specified conditions of temperature and load. Procedure A is a mass-measurement method. Procedure B is a displacement-measurement method. Normally, the test conditions for measurement of melt flow rate are specified in the material standard with a reference to this document. The test conditions normally used for thermoplastics are listed in Annex A.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 08-08-2023 08-01-2024 23-03-2024 07-08-2024 Mr. SHIVAM DWIVEDI 08-08-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 31-05-2023 -------
2 P-Draft Waived 08-08-2023 -------
3 WC Draft 08-08-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 08-08-2023 WC approved by HOD
PCDC  PCD 12, PCD 21, -------