Document Details |
|||||
Name of Department/Committee : | PCD 27 | ||||
---|---|---|---|---|---|
Document Number : | PCD 27 ( 23186) | ||||
Document Title [English] : | PLASTICS METHODS OF TESTING PART 5 MECHANICAL PROPERTIES SECTION 5 DETERMINATION OF CHARPY IMPACT PROPERTIES SUBSEC 2 INSTRUMENTED IMPACT TEST | ||||
Document Title [Hindi] : | PLASTICS — METHODS OF TESTING PART 5 MECHANICAL PROPERTIES SECTION 5 DETERMINATION OF CHARPY IMPACT PROPERTIES SUBSEC 2 INSTRUMENTED IMPACT TEST | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 83.080.01 | ||||
Date of Project Approval : | 31-05-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Plastic Films, Bottles, Jars, Pipes, Sockets and Other Products |
Sub Sub Group : | Method of test for plastics |
Aspects : | Methods of tests |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 179-2 : 2020 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This document specifies a method for determining Charpy impact properties of plastics from force-deflection diagrams. Different types of rod-shaped test specimens and test configurations, as well as test parameters depending on the type of material, the type of test specimen and the type of notch, are defined in ISO 179-1. Dynamic effects such as load-cell/striker resonance, test specimen resonance and initial-contact/inertia peaks are described in this document (see Figure 1, Curve b, and Annex A). |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 31-05-2023 | ------- | ||
2 | P-Draft Waived | 08-08-2023 | ------- | ||
3 | WC Draft | 08-08-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 08-08-2023 | WC approved by HOD |
PCDC PCD 12, PCD 27, | ------- |