Document Details
Name of Department/Committee : PCD 27
Document Number : PCD 27 ( 23184)
Document Title [English] : PLASTICS METHODS OF TESTING PART 5 MECHANICAL PROPERTIES SECTION 5 DETERMINATION OF CHARPY IMPACT PROPERTIES SUBSEC 1 NON-INSTRUMENTED IMPACT TEST
Document Title [Hindi] : PLASTICS — METHODS OF TESTING PART 5 MECHANICAL PROPERTIES SECTION 5 DETERMINATION OF CHARPY IMPACT PROPERTIES SUBSEC 1 NON-INSTRUMENTED IMPACT TEST
Document Type : Revision
Language : English
Priority : 3
ICS Code : 83.080.01
Date of Project Approval : 31-05-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 13360 : Part 5 : Sec 5: 2017
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 13360 : Part 5 : Sec 5: 2017


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Plastic Films, Bottles, Jars, Pipes, Sockets and Other Products
Sub Sub Group : Method of test for plastics
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Chemicals and Fertilizers - Department of Chemicals and Petrochemicals (DCPC)
Sustainable development Goals :
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 179-1 : 2023
Organization Type: ISO

Sl.No. Synosis Points
1 This standard specifies a method for determining the Charpy impact strength of plastics under defined conditions. A number of different types of specimen and test configurations are defined. Different test parameters are specified according to the type of material, the type of test specimen and the type of notch.
2 As the ISO is available in two parts, the Committee decided to bifurcate the standard (IS 13360 (Part 5/Sec 5)) into two subsections as: Subsec 1: Non-instrumented impact test Subsec 2: Instrumented impact test

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 08-08-2023 08-01-2024 23-03-2024 07-08-2024 Mr. SHIVAM DWIVEDI 08-08-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 31-05-2023 -------
2 P-Draft Waived 08-08-2023 -------
3 WC Draft 08-08-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 08-08-2023 WC approved by HOD
PCDC  PCD 12, PCD 21, -------