Document Details |
|||||
Name of Department/Committee : | PCD 27 | ||||
---|---|---|---|---|---|
Document Number : | PCD 27 ( 23183) | ||||
Document Title [English] : | PLASTICS METHODS OF TESTING PART 3 PHYSICAL AND DIMENSIONAL PROPERTIES SECTION 4 DETERMINATION OF BULK FACTOR OF MOULDING MATERIALS | ||||
Document Title [Hindi] : | PLASTICS — METHODS OF TESTING PART 3 PHYSICAL AND DIMENSIONAL PROPERTIES SECTION 4 DETERMINATION OF BULK FACTOR OF MOULDING MATERIALS | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 83.080.01 | ||||
Date of Project Approval : | 31-05-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Plastic Films, Bottles, Jars, Pipes, Sockets and Other Products |
Sub Sub Group : | Method of test for plastics |
Aspects : | Methods of tests |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 171 : 2022 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This standard specifies a method of determining the bulk factor of a moulding material based on the ratio of the apparent volumetric density of a given quantity of particles and the corresponding material density. | |
2 | The major changes in this revision are as follows: — the normative references have been updated; — the definition of the bulk factor has been revised; — the principle of the method has been added; and — the document has been editorially revised. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 31-05-2023 | ------- | ||
2 | P-Draft Waived | 08-08-2023 | ------- | ||
3 | WC Draft | 08-08-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 08-08-2023 | WC approved by HOD |
PCDC PCD 12, PCD 21, | ------- |