Document Details
Name of Department/Committee : PCD 21
Document Number : PCD 21 ( 23123)
Document Title [English] : BLOW MOULDED POLYOLEFIN CONTAINERS SPECIFICATION PART 3 CLOSED HEAD CONTAINERS OVER 60 LITRES UPTO AND INCLUDING 250 LITRES CAPACITY
Document Title [Hindi] : BLOW MOULDED POLYOLEFIN CONTAINERS — SPECIFICATION PART 3 CLOSED HEAD CONTAINERS OVER 60 LITRES, UPTO AND INCLUDING 250 LITRES CAPACITY
Document Type : Revision
Language : English
Priority : 3
ICS Code : 55.120
Date of Project Approval : 21-06-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 7408 : Part 3: 2000
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 7408 : Part 3: 2000


Classification Details
Group : Chemicals, Plastics and their Products including packaging and Environment
Sub Group : Plastic Films, Bottles, Jars, Pipes, Sockets and Other Products
Sub Sub Group : PE pipes, Fittings and their testing
Aspects : Product Specification
Risk : Low
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Consumer Affairs, Food and Public Distribution - Department of Consumer Affairs
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard (Part 3) specifies tolerances on dimensions, performance requirements and methods of sampling and tests for free standing blow moulded containers, made from Polyoletins, with capacities over 60 litres, up to and including 250 litres and having an internal neck diameter not exceeding 75 mm. A recommended range of nominal capacities for stock containers for liquid products is included.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 02-08-2023 02-01-2024 17-03-2024 01-08-2024 Ms. Anmol Agarwal 02-08-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 21-06-2023 -------
2 P-Draft Waived 02-08-2023 The Committee decided to issue the draft into Wide Circulation. -------
3 WC Draft 02-08-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 04-08-2023 WC approved by HOD
PCDC   -------