Document Details
Name of Department/Committee : ETD 16
Document Number : ETD 16 ( 23039)
Document Title [English] : Onsite diagnostic testing of power transformers for condition health assessment
Document Title [Hindi] : स्थिति स्वास्थ्य मूल्यांकन के लिए बिजली ट्रांसफार्मर का ऑनसाइट नैदानिक ​​परीक्षण
Document Type : New
Language : English
Priority : 2
ICS Code : 29.180
Date of Project Approval : 20-10-2022
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Insulating material and systems
Sub Sub Group : Industrial Transformer
Aspects : Methods of tests
Risk : Medium
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 1866: 2017 Mineral insulating oils in electrical equipment supervision and maintenance guidance (Fourth Revision)

::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) ::
Sl. No. Prefix Number Part Section Year
1 IEC 60076 18 - 2012
2 IEC 60599 - - 2022

Sl.No. Synosis Points
1 Due to disturbances/ transients from the power system as well as increasing age of the transformer population, onsite diagnostic testing and condition assessment are important to secure a reliable operation of the electrical power system. For this purpose, offline and online diagnostic methods for power transformers have been developed which offers the possibility of detecting incipient faults. Offline diagnostic methods are used mainly during scheduled inspections or when transformer trips and it is suspected that the transformer has failed whereas online methods are used during the operation and offer a possibility to record the parameters and monitor the condition under realistic operating conditions (e.g., electric field, load, and temperature).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 20-07-2023 20-11-2023 20-12-2023 20-04-2024 Mr. NEERAJ KUSHWAHA 20-07-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 20-10-2022 -------
2 WC Draft 20-07-2023 Duration : 60 Days
Submitted for HOD approval
-------
3 WC Draft 24-07-2023 WC approved by HOD
ETDC   -------
4 WC Draft 07-03-2024 Stage-Changed -------
5 Finalization 18-12-2023 The document may be finalized as decided by the committee during the 31st Sectional Committee meeting on 18122023 -------
6 P-Draft Waived 28-06-2024 As per request received from ETD Department through email dated 27/06/2024, the document stage has been rolled back -------