Document Details |
|||||
Name of Department/Committee : | FAD 11 | ||||
---|---|---|---|---|---|
Document Number : | FAD 11 ( 23761) | ||||
Document Title [English] : | Sugarcane planter semi-automatic - Specification (First Revision) | ||||
Document Title [Hindi] : | सेमी-ऑटोमैटिक गन्ना बोने की मशीन— विशिष्टि ( पहला पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 65.060.30 | ||||
Date of Project Approval : | 11-08-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Agriculture, Agricultural Products and Implements |
Sub Group : | Agricultural Implements and godowns |
Sub Sub Group : | General Agricultural Equipment |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Sugarcane planters are agricultural machines designed specifically to mechanize the process of planting sugarcane. | |
2 | Sugarcane planters are of two types, namely, drop type, and cutter type. A drop type planter opens the furrow, places setts and fertilizer and covers with soil. In the cutter type planter, the whole sugarcane stem is fed and the planter cuts it to a predetermined length and carries it to the furrow. | |
3 | This standard specifies material, constructional, performance and other requirements of semi-automatic tractor drawn, drop type sugarcane planters. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 11-08-2022 | ------- | ||
2 | P-Draft Waived | 10-10-2023 | In its 22nd meeting of FAD 11 held on 11 August 2022, the committee approved the draft revision of IS 11976 for wide circulation. | ------- | |
3 | WC Draft | 10-10-2023 | Duration : 62 Days Submitted for HOD approval Remarks : In its 22nd meeting of FAD 11 held on 11 August 2022 the committee approved the draft revision of IS 11976 for wide circulation |
------- | |
4 | WC Draft | 12-10-2023 | WC approved by HOD |
FADC FAD 11, FAD 11 : P3, | ------- |