Document Details
Name of Department/Committee : PCD 01
Document Number : PCD 01 ( 23725)
Document Title [English] : METHODS OF TEST FOR PETROLEUM AND ITS PRODUCTS DETERMINATION OF SULFUR CONTENT ENERGY - DISPERSIVE X-RAY FLUORESCENCE SPECTROMETRY
Document Title [Hindi] : METHODS OF TEST FOR PETROLEUM AND ITS PRODUCTS — DETERMINATION OF SULFUR CONTENT — ENERGY - DISPERSIVE X-RAY FLUORESCENCE SPECTROMETRY
Document Type : New
Language : English
Priority : 3
ICS Code : 75.080
Date of Project Approval : 10-02-2023
Standards to be Superseded :


Classification Details
Group : Coal and Petroleum products
Sub Group : Petroleum products
Sub Sub Group : Instrumental Test Methods for Petroleum, Petroleum Products & Lubricants
Aspects : Methods of tests
Risk : None
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Petroleum and Natural Gas
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : ISO 8754:2003
Organization Type: ISO

Sl.No. Synosis Points
1 This Indian Standard is adopted by latest version of ISO 8754 :2003 with Identical under dual numbering.
2 This standard (Part 1) covers procedures and equipment for manually obtaining representative samples of liquid petroleum products, intermediate products and crude oils. This standard also covers sampling of semi liquid petroleum products.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 09-10-2023 09-03-2024 24-05-2024 09-10-2024 Hari Mohan Meena 09-10-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 10-02-2023 -------
2 P-Draft Waived 09-10-2023 During th meeting of subcommittee, Shri Ramakrishnan, CPCL informed that ISO 8754: 2003 need to be adopted. The Subcommittee requested BIS Sectt. to issue into Wide Circulation for a period of two months and the committee agreed for WC in its 21st meeting. -------
3 WC Draft 09-10-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 09-10-2023 WC approved by HOD
PCDC   -------
5 WC Draft 09-10-2023 WC approved by HOD
PCDC   -------