Document Details |
|
Name of Department/Committee : | PCD 01 |
---|---|
Document Number : | PCD 01 ( 23724) |
Document Title [English] : | METHODS OF TEST FOR PETROLEUM AND ITS PRODUCTS DETERMINATION OF HYDROCARBON TYPES AND OXYGENATES IN AUTOMOTIVE-MOTOR GASOLINE AND IN ETHANOL E85 AUTOMOTIVE FUEL MULTIDIMENSIONAL GAS CHROMATOGRAPHY METHOD |
Document Title [Hindi] : | METHODS OF TEST FOR PETROLEUM AND ITS PRODUCTS — DETERMINATION OF HYDROCARBON TYPES AND OXYGENATES IN AUTOMOTIVE-MOTOR GASOLINE AND IN ETHANOL (E85) AUTOMOTIVE FUEL — MULTIDIMENSIONAL GAS CHROMATOGRAPHY METHOD |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 75.080 |
Date of Project Approval : | 10-02-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Coal and Petroleum products |
Sub Group : | Petroleum products |
Sub Sub Group : | Instrumental Test Methods for Petroleum, Petroleum Products & Lubricants |
Aspects : | Methods of tests |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | ISO 22854:2021 |
Organization Type: | ISO |
Sl.No. | Synosis Points | |
1 | This Indian Standard is adopted by latest version of ISO 22854:2021 with Identical under dual numbering. | |
2 | This standard (Part 1) covers procedures and equipment for manually obtaining representative samples of liquid petroleum products, intermediate products and crude oils. This standard also covers sampling of semi liquid petroleum products. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 10-02-2023 | ------- | ||
2 | P-Draft Waived | 09-10-2023 | During 4th meeting of subcommittee, Dr Ashutosh Mishra, IOCL requested BIS Sectt. to adopt ISO 22854 under dual numbering and the same recommended by the subcommittee. The committee agreed for WC in its 21st meeting. | ------- | |
3 | WC Draft | 09-10-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 09-10-2023 | WC approved by HOD |
PCDC | ------- |
5 | WC Draft | 09-10-2023 | WC approved by HOD |
PCDC | ------- |