Document Details |
|||||
Name of Department/Committee : | MTD 26 | ||||
---|---|---|---|---|---|
Document Number : | MTD 26 ( 23691) | ||||
Document Title [English] : | Guidelines for Design and Construction of Continuous Pusher Type Coal /Oil/Gas Top Fired Reheating Furnaces (First Revision) | ||||
Document Title [Hindi] : | सतत पुशर टाइप के कोयला/तेल/गैस ऊपरी तपत रीहीटिंग भट्टियों के डिज़ाइन एवं निर्माण संबंधी दिशानिर्देश (पहला पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 25.180.20 | ||||
Date of Project Approval : | 03-10-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Industrial and other gases, Gas Cylinders and Fittings, boilers and pressure vessels |
Sub Sub Group : | Air & Fuel Gases |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This Indian Standard covers the general guidelines for design and construction for coal/ oil/ gas fired continuous pusher type top fired reheating furnace. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 03-10-2023 | ------- | ||
2 | P-Draft Waived | 03-10-2023 | ------- | ||
3 | WC Draft | 03-10-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 04-10-2023 | WC rejected by HOD Remarks: Please discuss |
------- | |
5 | WC Draft | 11-10-2023 | Duration : 60 Days Submitted for HOD approval Remarks : Modified document attached as discussed |
------- | |
6 | WC Draft | 11-10-2023 | WC rejected by HOD Remarks: PLease mention about the changes made in the revsiion in the foreword |
------- | |
7 | WC Draft | 01-03-2024 | Duration : 60 Days Submitted for HOD approval Remarks : The draft document has been modified as suggested |
------- | |
8 | WC Draft | 03-03-2024 | WC rejected by HOD Remarks: kindly check month of wc on first page and covering letter |
------- | |
9 | WC Draft | 04-03-2024 | Duration : 60 Days Submitted for HOD approval Remarks : The covering letter and the first page of the WC Draft have been updated |
------- | |
10 | WC Draft | 06-03-2024 | WC approved by HOD |
MTDC | ------- |