Document Details |
|||||
Name of Department/Committee : | PGD 40 | ||||
---|---|---|---|---|---|
Document Number : | PGD 40 ( 23667) | ||||
Document Title [English] : | Conveyor and Elevator Textile Belting Specification Part 5 Fire Resistant Belting for Surface Application | ||||
Document Title [Hindi] : | वाहक और उत्थापक वस्त्र पट्टा — विशिष्ट भाग 5 सतह अनुप्रयोग के लिए अग्नि प्रतिरोधी पट्टा | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 53.040.10 | ||||
Date of Project Approval : | 25-09-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Transmission equipments and bearings |
Sub Sub Group : | Transmission, conveyer and elevator Belting |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard IS1891 (Part 5) covers the requirements of conveyor and elevator textile belting with antistatic rubber and /or PVC conveyors for the surface application, flat or troughed idlers, where there is an element of fire risk present. This standard is particularly applicable for conveying fiery materials like coal or there is a previous history of fire. It is experienced that fire had taken place even after using fire-resistant belts. In those high fire risk applications, it is observed that one of the causes of that fire is the higher flammability of the belt when the cover of the belt has been removed. To address a similar situation a new grade/type of fire-resistant belt has been introduced to maintain the flammability properties of the belt without cover rubber present in the belt. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 25-09-2023 | ------- | ||
2 | P-Draft Waived | 25-09-2023 | ------- | ||
3 | WC Draft | 26-09-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 27-09-2023 | WC rejected by HOD Remarks: Please correct the Hindi Title |
------- | |
5 | WC Draft | 05-10-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 22-11-2023 | WC rejected by HOD Remarks: Please correct as indicated on the hard copy. |
------- | |
7 | WC Draft | 31-01-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
8 | WC Draft | 31-01-2024 | WC rejected by HOD Remarks: Please add WC along with the document number |
------- | |
9 | WC Draft | 02-02-2024 | Duration : 60 Days Submitted for HOD approval |
------- | |
10 | WC Draft | 05-02-2024 | WC approved by HOD |
PGDC | ------- |