Document Details |
|||||
Name of Department/Committee : | CHD 08 | ||||
---|---|---|---|---|---|
Document Number : | CHD 08 ( 23661) | ||||
Document Title [English] : | RESPIRATORY PROTECTIVE DEVICES Part 3 Fresh Air Hose and Compressed Air Line Breathing Apparatus | ||||
Document Title [Hindi] : | श्वसन सुरक्षा उपकरण भाग 3 ताजी हवा की नली और संपीड़ित वायु लाइन श्वास उपकरण | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 13.340.30 | ||||
Date of Project Approval : | 28-04-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Chemical Products |
Sub Sub Group : | Occupational Health and Safety Protection |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | During this second revision, changes due to revision of test standards on respiratory protective devices and publication of European standards on compressed air line breathing apparatus have been incorporated. Overall, the following changes have been made: a) Material b) Visual inspection test c) Water immersion requirement and test d) Cleaning and disinfection as specified by manufacturer and visual verification e) Practical performance test f) Connections – hose and couplings g) Requirement of performance after storage h) Requirement for flammability added j) Modified requirement for carbon dioxide content in inhaled air |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 28-04-2023 | ------- | ||
2 | P-Draft Waived | 25-09-2023 | ------- | ||
3 | WC Draft | 25-09-2023 | Duration : 62 Days Submitted for HOD approval Remarks : The Sectional Committee CHD 08 in its 23rd meeting had decided to send the document for wide circulation for a period of 60 days Kindly approve |
------- | |
4 | WC Draft | 12-10-2023 | WC rejected by HOD Remarks: Please check Foreword and discuss. |
------- | |
5 | WC Draft | 20-11-2023 | Duration : 62 Days Submitted for HOD approval Remarks : The required corrections have been done Kindly approve |
------- | |
6 | WC Draft | 20-11-2023 | WC approved by HOD |
CHDC | ------- |