Document Details
Name of Department/Committee : CHD 26
Document Number : CHD 26 ( 23636)
Document Title [English] : SPECIFICATION FOR PENTAERYTHRITOL FOR EXPLOSIVE INDUSTRY (First Revision)
Document Title [Hindi] : विस्फोटक उद्योग के लिए पेंटाएरीथ्रिटोल के लिए विशिष्टता (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : 71.100.30
Date of Project Approval : 20-06-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 10977: 1984
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 10977: 1984


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Arms, ammunitions, explosives and fireworks
Sub Sub Group : Arms and Ammunition
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title : PENTAERYTHRITOL FOR EXPLOSIVE INDUSTRY
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry - Department for Promotion of Industry and Internal Trade (DPIIT)
  • Ministry of Chemicals and Fertilizers
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Indian Standard specification for pentaerythritol (IS 7619) covers the requirements of the material for use in the manufacture of paint coatings and printing inks. It does not cover the nitration grade of the material required by the explosive industry. This standard is intended to cover the material used for the production of pentaerythritol tetranitrate for use in explosive and pyrotechnic compositions.
2 It is advisable for the users to carry out a trial nitration test with the material after ensuring conformity to this specification to assess the desired quality of the end product.
3 This Indian Standard was originally published in 1984. This first revision has been taken up to update the ICS No and several other editorial changes in order to bring out the standard in the latest style and format of the Indian Standards.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 22-09-2023 22-01-2024 22-02-2024 22-06-2024 Mr. MOHIT GARG 22-09-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 20-06-2023 -------
2 P-Draft Waived 25-09-2023 Document approved from WC in 27th Meeting of CHD 26 -------
3 WC Draft 25-09-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : The revised draft approved from WC in the 27th meeting of CHD 26
-------
4 WC Draft 06-10-2023 WC rejected by HOD
Remarks: Please put up with corrections.
-------
5 WC Draft 16-10-2023 Duration : 60 Days
Submitted for HOD approval
Remarks : Incorporated changes in the Foreword as discussed
-------
6 WC Draft 19-10-2023 WC approved by HOD
CHDC  CHD 26 : 1, -------