Document Details |
|||||
Name of Department/Committee : | CHD 26 | ||||
---|---|---|---|---|---|
Document Number : | CHD 26 ( 23636) | ||||
Document Title [English] : | SPECIFICATION FOR PENTAERYTHRITOL FOR EXPLOSIVE INDUSTRY (First Revision) | ||||
Document Title [Hindi] : | विस्फोटक उद्योग के लिए पेंटाएरीथ्रिटोल के लिए विशिष्टता (पहला पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 71.100.30 | ||||
Date of Project Approval : | 20-06-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Arms, ammunitions, explosives and fireworks |
Sub Sub Group : | Arms and Ammunition |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | PENTAERYTHRITOL FOR EXPLOSIVE INDUSTRY |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Indian Standard specification for pentaerythritol (IS 7619) covers the requirements of the material for use in the manufacture of paint coatings and printing inks. It does not cover the nitration grade of the material required by the explosive industry. This standard is intended to cover the material used for the production of pentaerythritol tetranitrate for use in explosive and pyrotechnic compositions. | |
2 | It is advisable for the users to carry out a trial nitration test with the material after ensuring conformity to this specification to assess the desired quality of the end product. | |
3 | This Indian Standard was originally published in 1984. This first revision has been taken up to update the ICS No and several other editorial changes in order to bring out the standard in the latest style and format of the Indian Standards. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 20-06-2023 | ------- | ||
2 | P-Draft Waived | 25-09-2023 | Document approved from WC in 27th Meeting of CHD 26 | ------- | |
3 | WC Draft | 25-09-2023 | Duration : 60 Days Submitted for HOD approval Remarks : The revised draft approved from WC in the 27th meeting of CHD 26 |
------- | |
4 | WC Draft | 06-10-2023 | WC rejected by HOD Remarks: Please put up with corrections. |
------- | |
5 | WC Draft | 16-10-2023 | Duration : 60 Days Submitted for HOD approval Remarks : Incorporated changes in the Foreword as discussed |
------- | |
6 | WC Draft | 19-10-2023 | WC approved by HOD |
CHDC CHD 26 : 1, | ------- |