Document Details
Name of Department/Committee : ETD 42
Document Number : ETD 42 ( 23629)
Document Title [English] : Wind Energy Generation Systems Part 50 Wind measurement Sec 1 Application of meteorological mast, nacelle and spinner mounted instruments
Document Title [Hindi] : पवन ऊर्जा उत्पादन प्रणालियाँ भाग 50 पवन मापन अनुभाग 1 मौसम संबंधी मस्तूल, नैसेले और स्पिनर माउंटेड उपकरणों का अनुप्रयोग
Document Type : New
Language : English
Priority : 3
ICS Code : 27.180
Date of Project Approval : 21-09-2023
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Renewable energy devices
Sub Sub Group : Solar flat plate collector , Water heating system, Solar cooker , Bio gas plant & Biomass cook stove
Aspects : Code of Practice
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of New and Renewable Energy
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 61400-50-1-2022
Organization Type: IEC

Division Council Chairperson Approval Details
Request Date: 27-08-2025
Status of Chairperson Approval: Division Council Chairperson approval uploaded by member secretary  (Click to View)
Division Council Chairperson : Ashok Kumar Rajput
Attachment :  View File 1
 View File 2
Sectional Committee Chairman Approval :
 View


::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 14973: 2025 Measurement of Fluid Flow in Closed Conduits - Velocity Area Method Using Pitot Static Tube (SECOND REVISION)

Sl.No. Synosis Points
1 This standard specifies methods and requirements for the application of instruments to measure wind speed (and related parameters, e.g. wind direction, turbulence intensity). Such measurements are required as an input to some of the evaluation and testing procedures for wind energy and wind turbine technology (e.g. resource evaluation and turbine performance testing) described by other standards in the IS/IEC 61400 series.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 21-09-2023 21-02-2024 06-05-2024 21-09-2024 RITWIK ANAND 21-09-2023