Document Details
Name of Department/Committee : ETD 42
Document Number : ETD 42 ( 23628)
Document Title [English] : Wind energy generation systems Part 21-2: Measurement and assessment of electrical characteristics Wind power plants
Document Title [Hindi] : Wind energy generation systems – Part 21-2: Measurement and assessment of electrical characteristics – Wind power plants
Document Type : New
Language : English
Priority : 3
ICS Code : 27.180
Date of Project Approval : 21-09-2023
Standards to be Superseded :


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Renewable energy devices
Sub Sub Group : Solar flat plate collector , Water heating system, Solar cooker , Bio gas plant & Biomass cook stove
Aspects : Methods of tests
Risk : Medium
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of New and Renewable Energy
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 61400-21-2-2023
Organization Type: IEC

Sl.No. Synosis Points
1 This standard defines and specifies the quantities that are determined to characterize the electrical characteristics of grid-connected power plants (PPs). This document defines the measurement and test procedures for quantifying the electrical characteristics as basis for the verification of compliance of PPs, including: • power quality aspects, • steady state operation, • dynamic response (undervoltage and overvoltage fault ride-through), • disconnection from grid (grid protection), • control performance.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 21-09-2023 21-02-2024 06-05-2024 21-09-2024 RITWIK ANAND 21-09-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 21-09-2023 -------
2 P-Draft Waived 21-09-2023 -------
3 WC Draft 21-09-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 25-09-2023 WC approved by HOD
ETDC   -------