Document Details
Name of Department/Committee : ETD 42
Document Number : ETD 42 ( 23625)
Document Title [English] : Wind energy generation systems Part 12-1: Power performance measurements of electricity producing wind turbines First Revision
Document Title [Hindi] : Wind energy generation systems – Part 12-1: Power performance measurements of electricity producing wind turbines ( First Revision )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 27.180
Date of Project Approval : 21-09-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS/IEC 61400 : Part 12 : Sec 1: 2017
Standards to be Superseded :
Sl.No. Is No & Year
1 IS/IEC 61400 : Part 12 : Sec 1: 2017


Classification Details
Group : Electrical Switchgear and Other Electrical Products/Accessories
Sub Group : Renewable energy devices
Sub Sub Group : Solar flat plate collector , Water heating system, Solar cooker , Bio gas plant & Biomass cook stove
Aspects : Methods of tests
Risk : Low
Certification : Not Certifiable
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of New and Renewable Energy
Sustainable development Goals :
  • AFFORDABLE AND CLEAN ENERGY
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : IEC 61400-12-1-2022
Organization Type: IEC

Sl.No. Synosis Points
1 This standard specifies a procedure for measuring the power performance characteristics of a single wind turbine and applies to the testing of wind turbines of all types and sizes connected to the electrical power network. In addition, this document defines a procedure to be used to determine the power performance characteristics of small wind turbines when connected to either the electric power network or a battery bank.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 21-09-2023 21-02-2024 06-05-2024 21-09-2024 RITWIK ANAND 21-09-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 21-09-2023 -------
2 P-Draft Waived 21-09-2023 -------
3 WC Draft 21-09-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 25-09-2023 WC approved by HOD
ETDC  ETD 42, -------