Document Details |
|||||
Name of Department/Committee : | FAD 30 | ||||
---|---|---|---|---|---|
Document Number : | FAD 30 ( 23542) | ||||
Document Title [English] : | ULTRAVIOLET WATER DISINFECTION SYSTEM SPECIFICATION | ||||
Document Title [Hindi] : | पराबैंगनी जल कीटाणुशोधन प्रणाली — विशिष्टि (पहला पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | ICS 11.080.99 | ||||
Date of Project Approval : | 28-06-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Household Products Appliances(non-electrical) |
Sub Group : | Drinking Water related Equipment |
Sub Sub Group : | Water Purification System |
Aspects : | Product Specification |
Risk : | High |
Certification : | Voluntary Certification |
Short Commom Man's Title : | UV based water disinfection system |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard covers systems employing Point of Use (PoU) ultraviolet technology for disinfection of water systems up to a flow rate of 2 litres per minute (LPM). The system is expected to give water free from water borne pathogens, which is safe and suitable for human consumption. | |
2 | This revision is undertaken to update the standard in line with the latest technological developments. In this revision, the following major changes have been incorporated: a) LED based technology has been considered and suitably incorporated in the standard. b) Challenge organism Sarcina lutea (Micrococcus luteus) for evaluating microbiological reduction has been replaced with MS2 and Qbeta coliphages considering that MS2 coliphage is one of the more resistant microorganisms, suitable to be used for UV based systems operating at 254nm and for wavelengths other than 254nm Qbeta coliphage is the bacteriophage of choice which gives a linear dose response reaction. c) The figures have been replaced with schematic representation of different systems. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 28-06-2023 | ------- | ||
2 | P-Draft Waived | 06-09-2023 | ------- | ||
3 | WC Draft | 26-10-2023 | Duration : 66 Days Submitted for HOD approval Remarks : The Committee in its 7th meeting held on 4th July 2023 decided to send the draft revision document into wide circulation with 60 days commenting period |
------- | |
4 | WC Draft | 27-10-2023 | WC rejected by HOD Remarks: As discussed |
------- | |
5 | WC Draft | 27-10-2023 | Duration : 66 Days Submitted for HOD approval Remarks : Necessary changes incorporated as discussed |
------- | |
6 | WC Draft | 27-10-2023 | WC approved by HOD |
FADC | ------- |
7 | WC Draft | 01-11-2024 | Duration : 30 Days Submitted for HOD approval Remarks : The committee in its 10th meeting agreed to the changes recommended in the draft considering the comments received on the draft Accordingly the changes have been incorporated in the draft and the draft is being issued into second wide circulation |
------- | |
8 | WC Draft | 01-11-2024 | WC approved by HOD |
FADC | ------- |