Name of Department/Committee : WRD 24
Document Number : WRD 24 ( 23493)
Document Title [English] : Use of Remote Sensing and Geographical Information System in Environmental Impact Assessment and Environment Management Plan — Recommendations
Document Title [Hindi] : पर्यावरणीय प्रभाव आकलन और पर्यावरण प्रबंधन योजना में रिमोट सेंसिंग और भौगोलिक सूचना प्रणाली का उपयोग — अनुसंशाएँ
Document Type : New
Language : English
Priority : 3
ICS Code : 13.020.30
Date of Project Approval : 25-03-2008
Standards to be Superseded :


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Environmental Impact Assessment and Environmental Management of River Valley Projects
Aspects : Code of Practice
Risk : Low
Certification : None
Short Commom Man's Title : REMOTE SENSING AND GIS AS RELEVANT TO EIA AND EMP
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 Remote sensing and geographical information system (GIS) has emerged as a powerful tool to survey and monitor natural resources of an area. The remote sensing and GIS techniques can be used widely for environmental impact assessment (EIA) and environment management plan (EMP) of water resources projects in India. The aim of these recommendations is to summarize well known and proved principles and to describe commonly used procedures, equipments and techniques in order to enable an engineer-in-charge of a water resources project to assess the environmental impact of that particular project. The need for following an experimental approach and learning through trial is emphasized while providing guidelines which would permit a project in charge to use his discretion without compromising the overall project requirements. This standard has, therefore, been formulated to give guidelines in this regard.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 30-09-2024 28-02-2025 30-06-2025 31-08-2025 Mr. Vaibhav Jindal 23-10-2024
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 25-03-2008 -------
2 P-Draft 04-09-2023 Covering letter generated -------
3 P-Draft 04-09-2023 Duration : 30 Days WRD 24, -------
4 Skipped to W-Draft 28-05-2024 Stage-Changed -------
5 WC Draft 28-05-2024 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 31-05-2024 WC rejected by HOD
Remarks: Resubmit the draft with the corrections pointed
-------
7 WC Draft 03-06-2024 Duration : 60 Days
Submitted for HOD approval
-------
8 WC Draft 05-06-2024 WC approved by HOD
WRDC   -------
9 WC-Draft 06-06-2024 WC-Draft Email Notifications Sent WRDC, WRD 24, -------