Document Details |
|||||
Name of Department/Committee : | WRD 24 | ||||
---|---|---|---|---|---|
Document Number : | WRD 24 ( 23488) | ||||
Document Title [English] : | Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) for River Valley and Hydroelectric Projects — Guidelines | ||||
Document Title [Hindi] : | नदी घाटी और हाइड्रोइलेक्ट्रिक परियोजनाओं के लिए पर्यावरण प्रभाव आंकलन (ईआईए) और पर्यावरण प्रबंधन योजना (ईएमपी) — दिशानिर्देश | ||||
Document Type : | New | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 13.020.30 | ||||
Date of Project Approval : | 29-06-2021 | ||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Environmental Impact Assessment and Environmental Management of River Valley Projects |
Aspects : | Code of Practice |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | EIA & EMP FOR RIVER VALLEY AND HYDRO-ELECTRIC PROJECTS |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
Sl. No. | Document No | Document Title | |
::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) :: |
|||||||||||||
Sl. No. | Prefix | Number | Part | Section | Year | ||||||||
Sl.No. | Synosis Points | |
1 | Sustainable development is built on three basic premises i.e., economic growth, ecological sustainability and social progress. Economic growth achieved in a way that does not consider environmental concerns will not sustain in the long run. Therefore, sustainable development needs careful integration of environmental, economic, and societal needs in order to achieve both a higher standard of living in short term and a net gain or maintaining equilibrium amongst human, natural and economic resources to support future generations in the long term. It is necessary to understand the interlinkage between environment and development in order to make choices for development that will be economically efficient, socially equitable and sustainable. | |
2 | The green revolution brought about in the country during the post-independence period has been greatly supported by various river valley and hydro-electric projects. However, like any other developmental activity, the river valley and hydro-electric projects have also had certain environmental impacts, both negative and positive. The environmental effects of water resources projects are being experienced and observed carefully in many developed as well as developing countries. | |
3 | Environmental Impact Assessment (EIA) is a tool for assisting environmental management and for contributing to sustainable development. The purpose of EIA is to identify potential environmental impacts from major development proposals and to propose means to avoid or reduce the adverse impacts. It has increasingly become a key aspect of many large-scale planning applications. The objective of environmental impact assessment in the context of river valley projects is to assess both the positive and negative impacts of a project so that necessary environmental management measures can be adopted, wherever necessary, so as to minimize the adverse impacts while maximizing the benefits. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 29-06-2021 | ------- | ||
2 | P-Draft Waived | 04-09-2023 | ------- | ||
3 | WC Draft | 04-09-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 04-09-2023 | WC approved by HOD |
WRDC | ------- |
5 | WC Draft | 04-09-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 04-09-2023 | WC approved by HOD |
WRDC | ------- |
7 | Skipped to Finalization | 05-07-2024 | Stage-Changed | ------- | |
8 | Finalization | 16-04-2024 | 19th meeting of WRD 24 | ------- | |
9 | Final Draft | 05-07-2024 | Submited for HOD approval Remarks: Finalized in the 19th meeting of WRD 24 held on 16 April 2024 |
------- | |
10 | Final Draft draft accepted by HOD and sent to Publication | 05-07-2024 | Final Draft approved by HOD | ------- |