Document Details
Name of Department/Committee : WRD 24
Document Number : WRD 24 ( 23488)
Document Title [English] : Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) for River Valley and Hydroelectric Projects — Guidelines
Document Title [Hindi] : नदी घाटी और हाइड्रोइलेक्ट्रिक परियोजनाओं के लिए पर्यावरण प्रभाव आंकलन (ईआईए) और पर्यावरण प्रबंधन योजना (ईएमपी) — दिशानिर्देश
Document Type : New
Language : English
Priority : 3
ICS Code : 13.020.30
Date of Project Approval : 29-06-2021
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 15845: 2009


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydraulic and other related structures
Sub Sub Group : Environmental Impact Assessment and Environmental Management of River Valley Projects
Aspects : Code of Practice
Risk : Low
Certification : None
Short Commom Man's Title : EIA & EMP FOR RIVER VALLEY AND HYDRO-ELECTRIC PROJECTS
ITCHS Code :
Ministry :
  • Ministry of Environment, Forest and Climate Change
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
No Cross References

Sl. No. Document No Document Title
No Cross References

::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) ::
Sl. No. Prefix Number Part Section Year
No Cross References.

Sl.No. Synosis Points
1 Sustainable development is built on three basic premises i.e., economic growth, ecological sustainability and social progress. Economic growth achieved in a way that does not consider environmental concerns will not sustain in the long run. Therefore, sustainable development needs careful integration of environmental, economic, and societal needs in order to achieve both a higher standard of living in short term and a net gain or maintaining equilibrium amongst human, natural and economic resources to support future generations in the long term. It is necessary to understand the interlinkage between environment and development in order to make choices for development that will be economically efficient, socially equitable and sustainable.
2 The green revolution brought about in the country during the post-independence period has been greatly supported by various river valley and hydro-electric projects. However, like any other developmental activity, the river valley and hydro-electric projects have also had certain environmental impacts, both negative and positive. The environmental effects of water resources projects are being experienced and observed carefully in many developed as well as developing countries.
3 Environmental Impact Assessment (EIA) is a tool for assisting environmental management and for contributing to sustainable development. The purpose of EIA is to identify potential environmental impacts from major development proposals and to propose means to avoid or reduce the adverse impacts. It has increasingly become a key aspect of many large-scale planning applications. The objective of environmental impact assessment in the context of river valley projects is to assess both the positive and negative impacts of a project so that necessary environmental management measures can be adopted, wherever necessary, so as to minimize the adverse impacts while maximizing the benefits.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 04-09-2023 04-02-2024 19-04-2024 03-09-2024 Mr. Vaibhav Jindal 04-09-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 29-06-2021 -------
2 P-Draft Waived 04-09-2023 -------
3 WC Draft 04-09-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 04-09-2023 WC approved by HOD
WRDC   -------
5 WC Draft 04-09-2023 Duration : 60 Days
Submitted for HOD approval
-------
6 WC Draft 04-09-2023 WC approved by HOD
WRDC   -------
7 Skipped to Finalization 05-07-2024 Stage-Changed -------
8 Finalization 16-04-2024 19th meeting of WRD 24 -------
9 Final Draft 05-07-2024 Submited for HOD approval

Remarks: Finalized in the 19th meeting of WRD 24 held on 16 April 2024
-------
10 Final Draft draft accepted by HOD and sent to Publication 05-07-2024 Final Draft approved by HOD -------