Name of Department/Committee : MED 16
Document Number : MED 16 ( 23485)
Document Title [English] : WELDED LOW CARBON STEEL CYLINDERS FOR LOW PRESSURE LIQUEFIABLE GASES NOT EXCEEDING 5 LITRE WATER CAPACITY SPECIFICATION Second Revision of IS 7142
Document Title [Hindi] : अधिकतम 5 लीटर पानी की क्षमता वाले अल्प दाब वाले द्रवित होने योग्य गैसों के लिए वेल्डिड निम्न कार्बन इस्पात सिलेंडर – विशिष्टि ( आई एस 7142 का दूसरा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 23.020.35
Date of Project Approval : 28-03-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 7142: 1995
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 7142: 1995


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Industrial and other gases, Gas Cylinders and Fittings, boilers and pressure vessels
Sub Sub Group : Gas Cylinder Design & Testing
Aspects : Product Specification
Risk : None
Certification : Mandatory Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Commerce and Industry
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard deals with welded low carbon steel two piece cylinders intended for storage and transportation of low pressure liquefiable gases, other than toxic gases, of nominal capacity exceeding 500 ml, but not exceeding 5 litres water capacity. This standard lays down the requirements for the materials, design, manufacture, construction, tests and marking of these cylinders.
2 Cylinders with water capacity more than 5 litres are covered in IS 3196 (Part 1 and Part 2).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 04-09-2023 04-02-2024 19-04-2024 03-09-2024 Mr. PRASOON YADAV 04-09-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 28-03-2023 -------
2 P-Draft 04-09-2023 Covering letter generated -------
3 P-Draft 04-09-2023 Duration : 30 Days
Remarks : Committee approved the document for P-Draft
MED 16, MED 16,  : ,  -------
4 Skipped to W-Draft 18-12-2023 Stage-Changed -------
5 WC Draft 21-12-2023 Duration : 30 Days
Submitted for HOD approval
Remarks : Commitee approved the document for WC during 31st meeting of MED16
-------
6 WC Draft 16-01-2024 WC rejected by HOD
Remarks: Please discuss along with the hard copy of the document.
-------
7 WC Draft 06-02-2024 Duration : 30 Days
Submitted for HOD approval
Remarks : Commitee approved the document for WC during 31st meeting of MED16
-------
8 WC Draft 07-03-2024 WC approved by HOD
MEDC  MED 16, : , -------