Name of Department/Committee : | LITD 11 | ||||
---|---|---|---|---|---|
Document Number : | LITD 11 ( 23467) | ||||
Document Title [English] : | Optical fibres Part 1-1: Measurement methods and test procedures General and guidance | ||||
Document Title [Hindi] : | प्रकाशिक तंतु भाग 1 मापन विधियाँ और परीक्षण प्रक्रियाएँ अनुभाग 1 सामान्य एवं मार्गदर्शन (दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 33.180.10 | ||||
Date of Project Approval : | 12-06-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Electronic components and devices |
Sub Sub Group : | Reliability of Electronic and Electrical items |
Aspects : | Methods of tests |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under single numbering |
Identical/Equivalent Standards : | IEC 60793-1-1:2022 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This part of IEC 60793 lists and gives guidance on the use of documents giving uniform requirements for measuring and testing optical fibres, thereby assisting in the inspection of fibres and cables for commercial (mostly telecommunications) purposes. | |
2 | The individual measurement and test methods are contained in the different parts of the IEC 60793 series. They are identified as IEC 60793-1-X, where "X" is an assigned sub-part number, indicating its affiliation to the IEC 60793-1 series. | |
3 | In general, measurements and tests methods apply to all class A multimode fibres and class B and class C single-mode optical fibres covered by the IEC 60793-2 series relating to product specifications, although there can be exceptions. Clause 1 of each part of the IEC 60793 series contains the scope for each particular attribute. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 12-06-2023 | ------- | ||
2 | P-Draft Waived | 18-09-2023 | As IEC is available P-Draft has been waived off | ------- | |
3 | WC Draft | 18-09-2023 | Duration : 31 Days Submitted for HOD approval Remarks : Committee has decided to circulate it for 1 month only it was previously circulated also |
------- | |
4 | WC Draft | 20-09-2023 | WC approved by HOD |