Document Details |
|
Name of Department/Committee : | LITD 11 |
---|---|
Document Number : | LITD 11 ( 23466) |
Document Title [English] : | Safety of laser products Part 2: Safety of optical fibre communication systems OFCSs (Superseding IS 14624(Part 2): 2012) |
Document Title [Hindi] : | लेजर उत्पादों की सुरक्षा भाग 2 ऑप्टिकल फाइबर संचार प्रणालियों (ओएफसीएसएस) की सुरक्षा |
Document Type : | Revision |
Language : | English |
Priority : | 3 |
ICS Code : | ICS 31.260; 33.180.01 |
Date of Project Approval : | 12-06-2023 |
Standards to be Revised : | |
Standards to be Superseded : |
Classification Details |
|
Group : | Electronic and Telecom equipments, components and devices |
Sub Group : | Electronic components and devices |
Sub Sub Group : | Reliability of Electronic and Electrical items |
Aspects : | Safety Standard |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Identical under dual numbering |
Identical/Equivalent Standards : | IEC 60825-2:2021 |
Organization Type: | IEC |
Sl.No. | Synosis Points | |
1 | This document provides requirements and specific guidance for the safe operation and maintenance of optical fibre communication systems (OFCSs). In these systems, optical power is possibly accessible outside the confines of the transmitting equipment and/or at great distance from the optical source. This document requires the assessment of hazard level at each accessible location of the OFCS as a replacement for product classification according to IEC 60825-1. It applies to the installed OFCS as an engineered, end-to-end assembly for the generation, transfer and receipt of optical radiation arising from lasers, light-emitting diodes (LEDs) or optical amplifiers, in which the transference is by means of optical fibre for communication and/or control purposes. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 12-06-2023 | ------- | ||
2 | P-Draft Waived | 18-09-2023 | as IEC Standard is available P-Draft has been waived off | ------- | |
3 | WC Draft | 18-09-2023 | Duration : 31 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 20-09-2023 | WC approved by HOD |
LITDC | ------- |