Document Details |
|
Name of Department/Committee : | FAD 30 |
---|---|
Document Number : | FAD 30 ( 22352) |
Document Title [English] : | Ultrafiltration UF Membrane - Based Point-Of-Use POU Drinking Water Treatment System Specification |
Document Title [Hindi] : | अल्ट्राफिल्ट्रेशन झिल्ली - आधारित पॉइंट ऑफ़ यूज़ पेयजल उपचार प्रणाली — विशिष्टि |
Document Type : | New |
Language : | English |
Priority : | 2 |
ICS Code : | 130.060.01 |
Date of Project Approval : | 15-02-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Household Products Appliances(non-electrical) |
Sub Group : | Drinking Water related Equipment |
Sub Sub Group : | Water Purification System |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard covers ultrafiltration (UF) membrane-based point-of-use (PoU) water treatment systems designed to reduce turbidity and particulate impurities, including microbiological contaminants, in water to make it suitable for human consumption. The standard prescribes minimum requirements for materials, design, construction, and performance of these systems. | |
2 | The standard covers plumbed-in and countertop (gravity) systems, designed for use with municipal tap water supply (TDS ≤ 500 mg/L) as feed water, for microbiological water safety at the point of use. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 15-02-2023 | ------- | ||
2 | P-Draft | 28-04-2023 | Covering letter generated | ------- | |
3 | P-Draft | 28-04-2023 | Duration : 30 Days | FAD 30, FAD 14, | ------- |
4 | Skipped to W-Draft | 26-10-2023 | Stage-Changed | ------- | |
5 | WC Draft | 26-10-2023 | Duration : 66 Days Submitted for HOD approval Remarks : The Committee in its 7th meeting held on 4 July 2023 decided to send the draft into wide circulation with 60 days commenting period |
------- | |
6 | WC Draft | 26-10-2023 | WC approved by HOD |
FADC | ------- |