Document Details |
|||||
Name of Department/Committee : | CED 39 | ||||
---|---|---|---|---|---|
Document Number : | CED 39 ( 22345) | ||||
Document Title [English] : | Criteria for earthquake resistant design of structures Part 2 Buildings (Seventh Revision) | ||||
Document Title [Hindi] : | संरचनाओं के भूकम्परोधी डिजाईन के मानदंड भाग 2 इमारतें (सातवा पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 91.120.25 | ||||
Date of Project Approval : | 16-03-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Safety of structures |
Sub Sub Group : | Earthquake Resistant & Blast Resistant design |
Aspects : | Code of Practice |
Risk : | High |
Certification : | None |
Short Commom Man's Title : | Seismic design of buildings |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard contains provisions specific to earthquake-resistant design of buildings. Unless stated otherwise, the provisions in this part of IS 1893 shall be read necessarily in conjunction with the general provisions as laid down in IS1893 (Part 1). | |
2 | In this seventh revision of the standard, additional criteria for earthquake resistant design of buildings made up of different materials is included as part of different sections. In this version, additional provisions had been added in Section 1 (for all buildings), Section 2 (for Masonry buildings), Section 3 (Concrete buildings) and Section 4 (Steel buildings). |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 16-03-2022 | ------- | ||
2 | P-Draft Waived | 26-04-2023 | ------- | ||
3 | WC Draft | 26-04-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 26-04-2023 | WC approved by HOD |
CEDC CED 02, CED 37, CED 38, CED 39, CED 46 : P4, | ------- |