Document Details
Name of Department/Committee : CED 39
Document Number : CED 39 ( 22345)
Document Title [English] : Criteria for earthquake resistant design of structures Part 2 Buildings (Seventh Revision)
Document Title [Hindi] : संरचनाओं के भूकम्परोधी डिजाईन के मानदंड भाग 2 इमारतें (सातवा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 91.120.25
Date of Project Approval : 16-03-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 1893 : Part 1: 2016
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 1893 : Part 1: 2016


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Safety of structures
Sub Sub Group : Earthquake Resistant & Blast Resistant design
Aspects : Code of Practice
Risk : High
Certification : None
Short Commom Man's Title : Seismic design of buildings
ITCHS Code :
Ministry :
  • Ministry of Home Affairs
  • Ministry of Housing and Urban Poverty Alleviation
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
  • SUSTAINABLE CITIES AND COMMUNITIES
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard contains provisions specific to earthquake-resistant design of buildings. Unless stated otherwise, the provisions in this part of IS 1893 shall be read necessarily in conjunction with the general provisions as laid down in IS1893 (Part 1).
2 In this seventh revision of the standard, additional criteria for earthquake resistant design of buildings made up of different materials is included as part of different sections. In this version, additional provisions had been added in Section 1 (for all buildings), Section 2 (for Masonry buildings), Section 3 (Concrete buildings) and Section 4 (Steel buildings).

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 25-04-2023 25-09-2023 10-12-2023 25-04-2024 Mr. JITENDRA KUMAR CHAUDHARY 25-04-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 16-03-2022 -------
2 P-Draft Waived 26-04-2023 -------
3 WC Draft 26-04-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 26-04-2023 WC approved by HOD
CEDC  CED 02, CED 37, CED 38, CED 39, CED 46 : P4, -------