Document Details |
|||||
Name of Department/Committee : | MTD 11 | ||||
---|---|---|---|---|---|
Document Number : | MTD 11 ( 22285) | ||||
Document Title [English] : | Use of welding in bridges and structures subject to dynamic loading - Code of practice (Third Revision) | ||||
Document Title [Hindi] : | गत्यात्मक भार से प्रभावित पुलों और संरचनाओं में वेल्डिंग का उपयोग - रीति संहिता ( तीसरा पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 25.160.10 | ||||
Date of Project Approval : | 17-04-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Welding Electrodes and Accessories |
Sub Sub Group : | Code of Practice on welding |
Aspects : | Code of Practice |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | Code of practice for use of welding in bridges and structures subject to dynamic loading |
ITCHS Code : | |
Ministry : | |
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | 1.1 This standard covers the use of manual, semi-automatic and automatic metal-arc welding processes in the fabrication of steel bridges and structures subject to dynamic loading by welding. 1.2 This standard also applies to the design, different stresses to be considered for the design, and construction of the bridges. 1.3 The welding procedure for this standard shall apply to IS 9595 : 1996 ‘Metal arc welding of carbon and carbon manganese steels Recommendations (first revision)’. 1.4 All the provisions stated for the inspection of welds in IS 822 : 1970 ‘Code of procedure for inspection of welds’, shall be applicable in conjunction with the provisions of this standard. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 17-04-2023 | ------- | ||
2 | P-Draft Waived | 21-11-2023 | The committee in its 22nd meeting decided to send the draft document for Wide Circulation for the period of 30 days. | ------- | |
3 | WC Draft | 21-11-2023 | Duration : 30 Days Submitted for HOD approval Remarks : For your kind comments and inputs please |
------- | |
4 | WC Draft | 21-11-2023 | WC approved by HOD |
MTDC | ------- |