Document Details |
|||||
Name of Department/Committee : | WRD 22 | ||||
---|---|---|---|---|---|
Document Number : | WRD 22 ( 22125) | ||||
Document Title [English] : | CONSTRUCTION AND MAINTENANCE OF RIVER EMBANKMENTS LEVEES GUIDELINES Second Revision of IS 11532 | ||||
Document Title [Hindi] : | नदीय तटबंधों का निर्माण और रखरखाव — दिशानिर्देश (IS 11532 का दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.140 | ||||
Date of Project Approval : | 17-03-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Planning, Design, Construction and Safety of Diversion works, Barrages and related structures |
Aspects : | Others |
Risk : | Low |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Major changes that have been brought out in this revision are: a) Clause 3.3.8 has been incorporated in borrow pits. b) Clause 3.5.2, 3.5.3 & 3.5.4 have been incorporated for better preparation of foundation. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 17-03-2023 | ------- | ||
2 | P-Draft Waived | 17-03-2023 | ------- | ||
3 | WC Draft | 17-03-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 17-03-2023 | WC approved by HOD |
WRDC WRD 22, | ------- |