Document Details
Name of Department/Committee : WRD 01
Document Number : WRD 01 ( 22063)
Document Title [English] : Measurement of Fluid Flow by Means of Pressure Differential Devices Inserted In Circular Cross Section Conduits Running Full Part 1 : General Principles And Requirements
Document Title [Hindi] : पूर्ण भरे बहाव वाली वृत्ताकार अनुप्रस्थ काट की वाहिकाओं में विभेदक दबाव उपकरणों के माध्यम से द्रव प्रवाह मापन भाग 1 सामान्य सिद्धांत एवं अपेक्षाएं
Document Type : Revision
Language : English
Priority : 3
ICS Code : 17.120.10
Date of Project Approval : 20-01-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 14615 : Part 1: 2018
2 IS 14615 : Part 1: 2018
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 14615 : Part 1: 2018


Classification Details
Group : Civil Engineering Design and Construction
Sub Group : Hydrometry and equipments
Sub Sub Group : Hydrometry & Equipments
Aspects : Code of Practice
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Jal Shakti
Sustainable development Goals :
  • GOOD HEALTH AND WELL BEING
  • CLIMATE ACTION
  • AFFORDABLE AND CLEAN ENERGY
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under single numbering
Identical/Equivalent Standards : ISO 5167 -1 : 2022
Organization Type: ISO

::Cross Referenced International Standard(s) & Standard(s) Of National SDO(s) ::
Sl. No. Prefix Number Part Section Year
1 ISO 5167 2 - 2022
2 ISO 5167 3 - 2022

Sl.No. Synosis Points
1 Improved consistency between ISO 5167-1 to ISO 5167-6 (some items that were new in ISO 5167-5 and ISO 5167-6 have been moved to this document)
2 A primary element has been set as part of a differential pressure metering system
3 A short section on diagnostics and CBM (Condition Based Monitoring) has been included
4 A limitation on the use of the 5 % 2° rule for an acceptable profile has been noted
5 Improved text about uncertainty calculation and an example in Annex E has been provided
6 Annexes on turndown and permanent pressure loss have been included

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 02-03-2023 02-08-2023 17-10-2023 03-03-2024 Mr. Ajay Meena 02-03-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 20-01-2023 -------
2 P-Draft Waived 02-03-2023 Revision of Indian Standard -------
3 WC Draft 02-03-2023 Duration : 90 Days
Submitted for HOD approval
-------
4 WC Draft 02-03-2023 WC rejected by HOD
Remarks: Check and resubmit
-------
5 WC Draft 02-03-2023 Duration : 90 Days
Submitted for HOD approval
-------
6 WC Draft 02-03-2023 WC approved by HOD
WRDC  WRD 01, -------
7 Skipped to Finalization 25-07-2024 Stage-Changed -------
8 Finalization 25-07-2024 ------ -------
9 Final Draft 25-07-2024 Submited for HOD approval
-------
10 Final Draft 25-07-2024 Final Draft approved by HOD -------
11 Final Draft draft rejected by Publication 09-08-2024 Final Draft rejected by Publication
Remarks: 1. Base document is watermarked. 2. Dual numbering should be done in case its not a special series.
-------