Document Details |
|
Name of Department/Committee : | PGD 08 |
---|---|
Document Number : | PGD 08 ( 22047) |
Document Title [English] : | Hydraulic Impulse Tools Specification |
Document Title [Hindi] : | हाइड्रोलिक आवेग उपकरण — विशिष्टि |
Document Type : | New |
Language : | English |
Priority : | 3 |
ICS Code : | 23.140.10 |
Date of Project Approval : | 13-09-2022 |
Standards to be Superseded : |
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Hand tools and machine components |
Sub Sub Group : | Pneumatic Tools |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | A hydraulic impulse tool is a type of equipment used for fastening or loosening bolts by delivering short, high-torque bursts (impulses) of hydraulic power. It uses hydraulic pressure to generate rapid, high-energy impacts that quickly tighten or loosen bolts with minimal effort from the operator. These tools are often used in heavy-duty applications like construction, oil and gas, and machinery maintenance, where fast and efficient fastening is required. The impulse action reduces the risk of over-tightening and provides more control compared to traditional impact wrenches. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 13-09-2022 | ------- | ||
2 | P-Draft | 27-02-2023 | Covering letter generated | ------- | |
3 | P-Draft | 27-02-2023 | Duration : 15 Days | PGD 8, | ------- |
4 | P-Draft | 15-10-2024 | Covering letter generated | ------- | |
5 | P-Draft | 15-10-2024 | Duration : 15 Days | PGD 8, | ------- |
6 | Skipped to W-Draft | 02-01-2025 | Stage-Changed | ------- | |
7 | WC Draft | 02-01-2025 | Duration : 30 Days Submitted for HOD approval |
------- | |
8 | WC Draft | 03-01-2025 | Duration : 30 Days Submitted for HOD approval Remarks : correction done as suggested |
------- | |
9 | WC Draft | 03-01-2025 | WC approved by HOD |
PGDC | ------- |