Document Details |
|
Name of Department/Committee : | FAD 05 |
---|---|
Document Number : | FAD 05 ( 22003) |
Document Title [English] : | COMPOUNDED FEED FOR PREGNANT COWS AND BUFFALOES - SPECIFICATION |
Document Title [Hindi] : | गर्भवती गायों और भैंसों के लिए मिश्रित चारा — विशिष्टि |
Document Type : | New |
Language : | English |
Priority : | 2 |
ICS Code : | 65.120 |
Date of Project Approval : | 21-02-2023 |
Standards to be Superseded : |
Classification Details |
|
Group : | Agriculture, Agricultural Products and Implements |
Sub Group : | Animal Feeds and their ingredients and equipments |
Sub Sub Group : | Compound feed, Feed Supplement and artificial insemination materials for livestock |
Aspects : | Product Specification |
Risk : | Medium |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | Adequate feeding ensures that all essential nutrients are provided to meet the nutrient requirements of pregnant cows and buffaloes. Therefore, it was felt to develop a separate specification for pregnant cows and buffaloes. | |
2 | This standard prescribes the requirements and the methods of sampling and test for compounded feed for pregnant cows and buffaloes. | |
3 | The standard specifies limits for quality characteristics such as moisture, crude protein, crude fat, crude fiber, acid insoluble ash, aflatoxin B1, etc. in the feed. It ensures that the feed is free from harmful constituents, metallic pieces and adulterants. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 21-02-2023 | ------- | ||
2 | P-Draft | 28-02-2023 | Covering letter generated | ------- | |
3 | P-Draft | 28-02-2023 | Duration : 31 Days | FAD 5, | ------- |
4 | Skipped to W-Draft | 10-07-2024 | Stage-Changed | ------- | |
5 | WC Draft | 10-07-2024 | Duration : 62 Days Submitted for HOD approval Remarks : The Committee in its 26th meeting held on 22 March 2024b decided to send the draft into wide circulation for a period of 60 days incorporating the agreed changes |
------- | |
6 | WC Draft | 15-07-2024 | WC rejected by HOD Remarks: Corrections indicated in hard copy. |
------- | |
7 | WC Draft | 15-07-2024 | Duration : 62 Days Submitted for HOD approval Remarks : As discussed corrections have been incorporated in the draft |
------- | |
8 | WC Draft | 15-07-2024 | WC approved by HOD |
FADC | ------- |