Document Details |
|||||
Name of Department/Committee : | PGD 37 | ||||
---|---|---|---|---|---|
Document Number : | PGD 37 ( 22675) | ||||
Document Title [English] : | High Strength Structural Bolts — Specification | ||||
Document Title [Hindi] : | उच्च शक्ति संरचनात्मक बोल्ट — विशिष्टी | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 21.060.20 | ||||
Date of Project Approval : | 12-04-2023 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Transmission equipments and bearings |
Sub Sub Group : | Transmission, conveyer and elevator Belting |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | High Strength Structural Bolts |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard covers the requirements for large series hexagon, high strength structural steel bolts in property classes 8.8 and 10.9 and in the size range M12 to M36 with short thread lengths suitable for use in both friction-type and bearing-type structural steel joints. Bolts to this standard when matched with the appropriate nuts have been designed to provide an assembly with a high level of assurance against failure by thread stripping on overtightening | |
2 | The third revision of this standard has been taken up to keep pace with the latest technological developments and international practices. In this revision following changes have been made: a) Amendment 1 and Amendment 2 have been incorporated. b) Size M12 has been added. c) References have been updated. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 12-04-2023 | ------- | ||
2 | P-Draft Waived | 12-12-2023 | ------- | ||
3 | WC Draft | 12-12-2023 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 15-12-2023 | WC rejected by HOD Remarks: Please correct as indicated on the hard copy. |
------- | |
5 | WC Draft | 28-12-2023 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 28-12-2023 | WC rejected by HOD Remarks: Please discuss |
------- | |
7 | WC Draft | 07-02-2024 | Duration : 30 Days Submitted for HOD approval Remarks : Submitted for your kind approval please |
------- | |
8 | WC Draft | 12-02-2024 | WC rejected by HOD Remarks: Change the month as February 2024 |
------- | |
9 | WC Draft | 12-06-2024 | Duration : 30 Days Submitted for HOD approval Remarks : The month has been corrected to June |
------- |