Document Details
Name of Department/Committee : FAD 11
Document Number : FAD 11 ( 22456)
Document Title [English] : Equiqment for crop protection - Air-assisted sprayers - Dimentsions of Nozzle Swivel Nuts (first revision )
Document Title [Hindi] : फसल सुरक्षा उपस्कर - वायु चलित फुहारा - नोजल स्विवेल नटो के आयाम (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : ICS 65.060.40
Date of Project Approval : 23-01-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 15921: 2011
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 15921: 2011


Classification Details
Group : Agriculture, Agricultural Products and Implements
Sub Group : Agricultural Implements and godowns
Sub Sub Group : General Agricultural Equipment
Aspects : Dimensions
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Agriculture - Department of Agriculture and Farmer Welfare
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 The standard was first published in 2011 as an idenctical adoption of ISO 14710 : 1996 ‘Equipment for crop protection — Air-assisted sprayers — Dimensions of nozzle swivel nuts’. However, the ISO standard has now been withdrawn. Considering the relevance of the standard in Indian context, the standard is being revised by converting it into an Indegenous Standard.
2 This Indian Standard specifies the outer dimensions of the swivel nuts of nozzles for air-assisted sprayers.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 12-05-2023 12-09-2023 12-10-2023 12-02-2024 Mr. Vikrant Chauhan 12-05-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 23-01-2023 -------
2 P-Draft 12-05-2023 Covering letter generated -------
3 P-Draft 12-05-2023 Duration : 22 Days
Remarks : In its 23rd meeting of FAD 11 held on 23 January 2023 the committee decided to circulate the revised draft among the committee members for 21 days for commenting
FAD 11, FAD 11,  -------
4 Skipped to W-Draft 12-02-2024 Stage-Changed -------
5 WC Draft 12-02-2024 Duration : 62 Days
Submitted for HOD approval
Remarks : The FAD 11 committee in its 24th meeting held on 23 June and 6 July 2023 decided to send the document into wide circulation for a period of 60 days for commenting
-------
6 WC Draft 12-02-2024 WC rejected by HOD
Remarks: Corections required in Foreword
-------
7 WC Draft 16-02-2024 Duration : 62 Days
Submitted for HOD approval
Remarks : corrections made submitted for approval
-------
8 WC Draft 16-02-2024 WC approved by HOD
FADC  FAD 11, -------