Document Details |
|||||
Name of Department/Committee : | WRD 05 | ||||
---|---|---|---|---|---|
Document Number : | WRD 05 ( 21364) | ||||
Document Title [English] : | SYMBOLS AND ABBREVATIONS FOR USE IN GEOLOGICAL MAPS SECTIONS AND SUBSURFACE EXPLORATORY LOGS PART 1 ABBREVATIONS | ||||
Document Title [Hindi] : | भूवैज्ञानिक मानचित्रों, अनुभागों और उपसतही खोजी लॉग में उपयोग के लिए चिह्न और संक्षिप्ताक्षर भाग 1 संकेताक्षर | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 93.160, 07.060 | ||||
Date of Project Approval : | 22-09-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Hydraulic and other related structures |
Sub Sub Group : | Geological Maps, subsurface Exploratory Logs and Geological Explorations for river valley projects |
Aspects : | Others |
Risk : | Low |
Certification : | Not Certifiable |
Short Commom Man's Title : | SYMBOLS AND ABBREVATIONS IN GEOLOGY |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | The first revision of this standard has been brought out to bring the standard in latest style and update with respect to the latest field practices. In revision of this standard, due weightage has been given to international co-ordination among the standards and practices prevailing in different countries in addition to relating it to the practices in the field in this country. In this first revision of standard, assistance have been derived from ISO 710 : 1989 Graphical symbol for use on detailed maps, plans and geological cross section. | |
2 | Significant Inputs have been taken from Geological Survey of India |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 22-09-2022 | ------- | ||
2 | P-Draft Waived | 05-12-2022 | As per the decision of the Committee in 26th meeting in Sept 2022 | ------- | |
3 | WC Draft | 05-12-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 05-12-2022 | WC rejected by HOD Remarks: Check for ISO referred standard |
------- | |
5 | WC Draft | 05-12-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 06-12-2022 | WC approved by HOD |
WRDC WRD 05, | ------- |