Document Details |
|||||
Name of Department/Committee : | MED 07 | ||||
---|---|---|---|---|---|
Document Number : | MED 07 ( 21122) | ||||
Document Title [English] : | BULK HANDLING EQUIPMENT SHIP LOADER RAIL MOUNTED DESIGN MANUFACTURE AND ERECTION CODE OF PRACTICE | ||||
Document Title [Hindi] : | बल्क हैंडलिंग उपकरण - जहाज लोडर - रेल माउंटिड - डिजाइन, निर्माण और उत्थापन - रीति संहिता | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 53.040; 53.080 | ||||
Date of Project Approval : | 21-10-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Conveyors, hoisting and lifting equipments and rope ways |
Sub Sub Group : | Conveyors |
Aspects : | Others |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard on ship loaders has been formulated to cover the mechanical, structural and electrical requirements. Information that is required to be exchanged between purchaser and manufacturer or supplier for a proper design or selection of the ship loader is covered in IS 13685. (Part 1) : 1993 ‘Bulk handling equipment — Ship loader — Data sheet for selection : Part 1 Information to be supplied by the purchaser’ and IS 13685 (Part 2) : 1993 ‘Bulk handling equipment — Ship loader — Data sheet for selection: Part 2 Information to be supplied by the manufacturer/supplier’. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 21-10-2022 | ------- | ||
2 | P-Draft Waived | 27-10-2022 | ------- | ||
3 | WC Draft | 27-10-2022 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 01-11-2022 | WC rejected by HOD Remarks: Please Check. |
------- | |
5 | WC Draft | 17-11-2022 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 17-11-2022 | WC approved by HOD |
MEDC | ------- |