Document Details |
|||||
Name of Department/Committee : | CHD 10 | ||||
---|---|---|---|---|---|
Document Number : | CHD 10 ( 21009) | ||||
Document Title [English] : | SODIUM NITRATE AND POTASSIUM NITRATE FOR GLASS COMPOSITIONS - SPECIFICATION First Revision | ||||
Document Title [Hindi] : | कांच के संयोजन के लिए सोडियम नाइट्रेट और पोटेशियम नाइट्रेट – विशिष्टि ( पहला पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 81.040.30 | ||||
Date of Project Approval : | 29-07-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Chemical Products |
Sub Sub Group : | Raw material for ceramic industry |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | Sodium Nitrate for glass, Potassium Nitrate for glass |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard was originally published in 1979. The first revision has been undertaken to bring it in line with the technological changes that may have happened over the last four decades. Several editorial changes such as the inclusion of the ICS No., Hindi Title, Reference Clause, etc. have also been incorporated. | |
2 | Sodium nitrate and potassium nitrate are used in batch compositions of glass, enamel frits and glazes in which their chief function is to oxidize organic matter which may contaminate batch materials, prevent reduction of some of the batch constituents, help maintain colours and accelerate the melting and fining processes. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 29-07-2022 | ------- | ||
2 | P-Draft Waived | 18-10-2022 | The revised draft has already been circulated through the portal as a part of the ARP process. | ------- | |
3 | WC Draft | 18-10-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 28-10-2022 | WC approved by HOD |
CHDC | ------- |