Document Details |
|||||
Name of Department/Committee : | MTD 34 | ||||
---|---|---|---|---|---|
Document Number : | MTD 34 ( 21958) | ||||
Document Title [English] : | Methods of chemical analysis of silver - Copper brazing alloys: Part 1 analysis for silver and copper | ||||
Document Title [Hindi] : | . | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 77.120.30 | ||||
Date of Project Approval : | 04-08-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Metals, Alloys and Metal Products (including Steel Products) |
Sub Group : | Non ferrous metals and their alloys |
Sub Sub Group : | Copper |
Aspects : | Methods of tests |
Risk : | None |
Certification : | Not Certifiable |
Short Commom Man's Title : | Methods of chemical analysis of silver - Copper brazing alloys: Part 1 analysis for silver and coppe |
ITCHS Code : | |
Ministry : | |
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This revision has been brought out to bring the standard in the latest style and format of the Indian Standards. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 04-08-2022 | ------- | ||
2 | P-Draft | 17-02-2023 | Covering letter generated | ------- | |
3 | P-Draft | 17-02-2023 | Duration : 14 Days Remarks : As per the directions of Competent Authority of the Bureau to review pre-2000 Standards undersigned has reviewed the standard IS 4667 Part 1 : 1968 After review of the standard IS 4667 Part 1 : 1968 it has been felt by undersigned that the standard may be brought out to bring in the latest style and format of Indian Standards Please provide the comments on P-Draft kindly permit us to presume as approval if no comments in stipulated time |
MTD 34, MTD 08, | ------- |
4 | Skipped to W-Draft | 09-08-2023 | Stage-Changed | ------- | |
5 | WC Draft | 09-08-2023 | Duration : 30 Days Submitted for HOD approval Remarks : This revision has been brought out to bring the standard in the latest style and format of the Indian Standards |
------- | |
6 | WC Draft | 09-08-2023 | WC approved by HOD |
MTDC MTD 08, | ------- |