Document Details |
|||||
Name of Department/Committee : | CED 03 | ||||
---|---|---|---|---|---|
Document Number : | CED 03 ( 21944) | ||||
Document Title [English] : | VITREOUS CHINA SANITARY APPLIANCES SPECIFICATION PART 3 SPECIFIC REQUIREMENTS OF SQUATTING PANS | ||||
Document Title [Hindi] : | काँचाभ चीनी मिट्टी के स्वच्छता उपकरण — विशिष्टि भाग 3 बिठाव कुंडों के लिए विशिष्ट अपेक्षाएं | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS 91.140.70 | ||||
Date of Project Approval : | 13-10-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Civil Engineering Design and Construction |
Sub Group : | Water supply, drainage and sanitation |
Sub Sub Group : | Waste water handling and related issues |
Aspects : | Product Specification |
Risk : | Low |
Certification : | Voluntary Certification |
Short Commom Man's Title : | Squatting Pan |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | a) The main title of the standard has been modified from ‘Vitreous Sanitary appliances (vitreous China)’ to ‘Vitreous China Sanitary Appliances’. | |
2 | b) Additional requirements for water efficiency and labelling of water closets have been incorporated through reference to the concerned Indian Standard. | |
3 | c) Other changes, keeping in view the manufacturing practices prevalent in the country at that time, were made. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 13-10-2022 | ------- | ||
2 | P-Draft Waived | 14-02-2023 | ------- | ||
3 | WC Draft | 16-02-2023 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 16-02-2023 | WC rejected by HOD Remarks: Kindly incorporate the changes as discussed |
------- | |
5 | WC Draft | 16-02-2023 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 16-02-2023 | WC approved by HOD |
CEDC CED 03, CED 3 : 1, CED 46 : P17, CED 3 : P1, | ------- |