Document Details
Name of Department/Committee : LITD 04
Document Number : LITD 04 ( 21790)
Document Title [English] : Measurement of the electrical properties of microwave tubes Part 7: High-power klystrons (First Revision)
Document Title [Hindi] : विद्युत का मापन माइक्रोवेव ट्यूब के गुण – भाग 7: हाई-पावर क्लाइस्ट्रॉन (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : 31.100
Date of Project Approval : 11-01-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 6134 : Part 7: 1981
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 6134 : Part 7: 1981


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic equipments and systems
Sub Sub Group : Electron tubes and accessories
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 60235-6:1972
Organization Type: IEC

Sl.No. Synosis Points
1 Deals with measurement of the electrical characteristics of high-power klystrons and gives the theory of this type of electronic tube, general precautions to be taken to prevent hazards to personnel and damage during measurement, and general measuring methods at radio frequencies.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 16-01-2023 16-05-2023 16-06-2023 16-10-2023 VINODINI KISHORE 16-01-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 11-01-2023 -------
2 P-Draft Waived 16-01-2023 -------
3 WC Draft 16-01-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 17-01-2023 WC rejected by HOD
Remarks: Pl modify as discussed
-------
5 WC Draft 08-04-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The document has been modify as per discussion with HOD All committee members are requested to give their inputs on wide circulation on given before last date of comment
-------
6 WC Draft 22-04-2024 WC rejected by HOD
Remarks: foreword-grammar mistake
-------
7 WC Draft 10-07-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : foreword-grammar mistake have been corrected
-------
8 WC Draft 10-07-2024 WC approved by HOD
LITDC   -------