Document Details
Name of Department/Committee : LITD 04
Document Number : LITD 04 ( 21788)
Document Title [English] : Measurement of the Electrical Properties of Microwave Tubes Part 4: Magnetrons (First Revision)
Document Title [Hindi] : विद्युत का मापन माइक्रोवेव ट्यूब के गुण – भाग 4: मैग्नेट्रोन (पहला पुनरीक्षण)
Document Type : Revision
Language : English
Priority : 2
ICS Code : 31.100
Date of Project Approval : 11-01-2023
Standards to be Revised :
Sl.No. Is No & Year
1 IS 6134 : Part 4: 1977
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 6134 : Part 4: 1977


Classification Details
Group : Electronic and Telecom equipments, components and devices
Sub Group : Electronic equipments and systems
Sub Sub Group : Electron tubes and accessories
Aspects : Methods of tests
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
Sustainable development Goals :
  • INDUSTRY, INNOVATION AND INFRASTRUCTURE
Degree of Equivalence : Identical under dual numbering
Identical/Equivalent Standards : IEC 60235-4:1972
Organization Type: IEC

Sl.No. Synosis Points
1 Gives general requirements and precautions which apply when making measurements on magnetrons.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 16-01-2023 16-05-2023 16-06-2023 16-10-2023 VINODINI KISHORE 16-01-2023
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 11-01-2023 -------
2 P-Draft Waived 16-01-2023 -------
3 WC Draft 16-01-2023 Duration : 60 Days
Submitted for HOD approval
-------
4 WC Draft 17-01-2023 WC rejected by HOD
Remarks: Pl modify as discussed
-------
5 WC Draft 05-04-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The document has been modify as per discussion with HOD all committee members are requested to give their inputs on wide circulation on given before last date of comment
-------
6 WC Draft 22-04-2024 WC rejected by HOD
Remarks: why part 2 is referred in foreword
-------
7 WC Draft 24-04-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The correction has been made please check
-------
8 WC Draft 02-05-2024 WC rejected by HOD
Remarks: chk year of iec std in foreword
-------
9 WC Draft 09-05-2024 Duration : 60 Days
Submitted for HOD approval
Remarks : The correction has been made please check
-------
10 WC Draft 16-05-2024 WC approved by HOD
LITDC   -------