Document Details
Name of Department/Committee : PGD 37
Document Number : PGD 37 ( 21518)
Document Title [English] : Taper Washers for Channels ISMC - Specification
Document Title [Hindi] : चैनलों के लिए टेपर विशर्स (आईएसएमसी) - विशिष्टता
Document Type : Revision
Language : English
Priority : 3
ICS Code : 21.060.30
Date of Project Approval : 22-07-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 5372: 1975
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 5372: 1975


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Transmission equipments and bearings
Sub Sub Group : Transmission, conveyer and elevator Belting
Aspects : Product Specification
Risk : None
Certification : Voluntary Certification
Short Commom Man's Title :
ITCHS Code :
Ministry :
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

Sl.No. Synosis Points
1 This standard specifies the requirements of square taper washer for use in structural bolting of steel channel sections using bolts up to property class 5.6.
2 This standard was first published in 1969 and subsequently revised in 1975. The second revision has been taken up to keep pace with the latest technological developments and international practices. In this revision following major changes have been made: a) Scope has been revised; b) Material requirements have been updated; c) Table on dimensions has been revised; d) Surface finish requirements have been added; and e) References have been updated.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 20-12-2022 20-05-2023 04-08-2023 19-12-2023 Mr. MONARCH JOSHI 20-12-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 22-07-2022 -------
2 P-Draft 27-12-2022 Covering letter generated -------
3 P-Draft 27-12-2022 Duration : 30 Days PGD 37, -------
4 Skipped to W-Draft 12-12-2023 Stage-Changed -------
5 WC Draft 12-12-2023 Duration : 30 Days
Submitted for HOD approval
-------
6 WC Draft 13-12-2023 WC approved by HOD
PGDC   -------