Document Details |
|||||
Name of Department/Committee : | MED 07 | ||||
---|---|---|---|---|---|
Document Number : | MED 07 ( 21449) | ||||
Document Title [English] : | BULK HANDLING EQUIPMENT CRAWLER TRACTORS DATA SHEET PART 2 INFORMATION TO BE SUPPLIED BY MANUFACTURERSUPPLIER Second Revision | ||||
Document Title [Hindi] : | बल्क हैंडलिग उपकरण — रिंगक ट्रेक्टर — डाटा शीट भाग 2 विनिर्माता/आपूर्तिकर्ता द्वारा आपूर्ति की जाने वाली जानकारी (दूसरा पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 53.040.30 | ||||
Date of Project Approval : | 07-12-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Gases, Gas Cylinders , Machine tools and other mechanical products |
Sub Group : | Conveyors, hoisting and lifting equipments and rope ways |
Sub Sub Group : | Batching & Bagging Equipment ,Conveying, Stacking, loading and un loading equipment |
Aspects : | Others |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
1 | IS 10463 : Part 6: 1983 | Glossary of terms for bulk handling equipment: Part 6 cyclic loose bulk handling equipment (Non - Stationary) | |
2 | IS 11738 : Part 1: 1993 | Bulk handling equipment - Crawler tractors - Data sheet: Part 1 information to be supplied by purchaser (First Revision) | |
3 | IS 13116: 2006 | Earth - Moving machinery - Engine test code - Net power (Second Revision) |
Sl.No. | Synosis Points | |
1 | This standard lays down the information required to be furnished by the manufacturer/supplier at the time of a tender enquiry or at the time of supply of the equipment. Equipment offered by the manufacturer/supplier shall be suitable to perform the duty as specified by the purchaser in accordance with Part 1 of this standard. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 07-12-2022 | ------- | ||
2 | P-Draft Waived | 13-12-2022 | ------- | ||
3 | WC Draft | 13-12-2022 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 03-01-2023 | WC approved by HOD |
MEDC | ------- |