Document Details
Name of Department/Committee : MED 07
Document Number : MED 07 ( 21449)
Document Title [English] : BULK HANDLING EQUIPMENT CRAWLER TRACTORS DATA SHEET PART 2 INFORMATION TO BE SUPPLIED BY MANUFACTURERSUPPLIER Second Revision
Document Title [Hindi] : बल्क हैंडलिग उपकरण — रिंगक ट्रेक्टर — डाटा शीट भाग 2 विनिर्माता/आपूर्तिकर्ता द्वारा आपूर्ति की जाने वाली जानकारी (दूसरा पुनरीक्षण )
Document Type : Revision
Language : English
Priority : 3
ICS Code : 53.040.30
Date of Project Approval : 07-12-2022
Standards to be Revised :
Sl.No. Is No & Year
1 IS 11738 : Part 2: 1993
Standards to be Superseded :
Sl.No. Is No & Year
1 IS 11738 : Part 2: 1993


Classification Details
Group : Gases, Gas Cylinders , Machine tools and other mechanical products
Sub Group : Conveyors, hoisting and lifting equipments and rope ways
Sub Sub Group : Batching & Bagging Equipment ,Conveying, Stacking, loading and un loading equipment
Aspects : Others
Risk : None
Certification : None
Short Commom Man's Title :
ITCHS Code :
Ministry :
  • Ministry of Heavy Industries
Sustainable development Goals :
Degree of Equivalence : Indigenous
Identical/Equivalent Standards :
Organization Type:

::Cross Referenced Indian Standard::
Sl. No. Is No & Year IS Title
1 IS 10463 : Part 6: 1983 Glossary of terms for bulk handling equipment: Part 6 cyclic loose bulk handling equipment (Non - Stationary)
2 IS 11738 : Part 1: 1993 Bulk handling equipment - Crawler tractors - Data sheet: Part 1 information to be supplied by purchaser (First Revision)
3 IS 13116: 2006 Earth - Moving machinery - Engine test code - Net power (Second Revision)

Sl.No. Synosis Points
1 This standard lays down the information required to be furnished by the manufacturer/supplier at the time of a tender enquiry or at the time of supply of the equipment. Equipment offered by the manufacturer/supplier shall be suitable to perform the duty as specified by the purchaser in accordance with Part 1 of this standard.

Timeline Details


S.No. P-Draft
Completion Date
WC-Draft
Completion Date
Final-Draft
Completion Date
Project
Completion Date(Gazette)
Entered By Entered On
1 13-12-2022 13-05-2023 28-07-2023 13-12-2023 KHASHBOO KUMARI 13-12-2022
Stages
Sl.
No.
Stage Date of Occurence Remarks Circulated to Files
1 Generation of Document Number 07-12-2022 -------
2 P-Draft Waived 13-12-2022 -------
3 WC Draft 13-12-2022 Duration : 30 Days
Submitted for HOD approval
-------
4 WC Draft 03-01-2023 WC approved by HOD
MEDC   -------