Document Details |
|
Name of Department/Committee : | ETD 51 |
---|---|
Document Number : | ETD 51 ( 20356) |
Document Title [English] : | ELECTRIC VEHICLE BATTERY SWAP SYSTEM PART 3 CENTRAL MANAGEMENT SYSTEM |
Document Title [Hindi] : | ELECTRIC VEHICLE BATTERY SWAP SYSTEM – PART 3 CENTRAL MANAGEMENT SYSTEM |
Document Type : | New |
Language : | English |
Priority : | 1 |
ICS Code : | 43.120 |
Date of Project Approval : | 22-07-2022 |
Standards to be Superseded : |
Classification Details |
|
Group : | Transport and Related Products |
Sub Group : | Automotive Electrical Equipment, Instruments and Systems |
Sub Sub Group : | Electrical Instruments |
Aspects : | Code of Practice |
Risk : | Medium |
Certification : | Not Certifiable |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | 1.1 This part of standard, which is Central Management System, allows an efficient communication between the different entities of the battery charging infrastructure. The Central Management System is an interconnection point for the subsystems in the ecosystem to ensure interoperability between all these subsystems. 1.2 The aspects covered in this standard include a) Functionalities of central management system b) Functionalities of user application that helps users to access swapping infrastructure c) Requirements of BaaS operator platform for maintaining all records |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 22-07-2022 | ------- | ||
2 | P-Draft Waived | 23-08-2022 | ------- | ||
3 | WC Draft | 23-08-2022 | Duration : 30 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 23-08-2022 | WC approved by HOD |
ETDC | ------- |