Document Details |
|||||
Name of Department/Committee : | TED 02 | ||||
---|---|---|---|---|---|
Document Number : | TED 02 ( 20895) | ||||
Document Title [English] : | PIPE UNION BOLT — SPECIFICATION (Second Revision) | ||||
Document Title [Hindi] : | पाइप यूनियन बोल्ट — विशिष्टि (दूसरा पुनरीक्षण) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | ICS: 43.060.40 | ||||
Date of Project Approval : | 17-10-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Transport and Related Products |
Sub Group : | Automobiles and their components |
Sub Sub Group : | IC Engine Components |
Aspects : | Product Specification |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | In the first revision of this standard the scope had been expanded to include, apart from the requirements of the fuel injection equipment, the requirements of the other pipe connections also. Consequently, the title had been changed. Also, for designation, the pipe outside diameter was taken as the nominal size. While revising this standard, assistance had been derived from DIN 7643 Brazed and welded pipe unions with spherical liners; hollow screws’, by Deutscher Normenausschuss (DNA). In this draft for second revision of this standard the referencing standards have been updated. A separate clause for references has also been introduced for ease of interpretation. However, wherever a reference to any Indian Standard appears in this specification, it shall be taken as a reference to the latest version of the standard. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 17-10-2022 | ------- | ||
2 | P-Draft | 17-10-2022 | Covering letter generated | ------- | |
3 | P-Draft | 17-10-2022 | Duration : 30 Days | TED 2, TED 02, | ------- |
4 | Skipped to W-Draft | 05-12-2023 | Stage-Changed | ------- | |
5 | WC Draft | 05-12-2023 | Duration : 60 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 06-12-2023 | WC rejected by HOD Remarks: Please make the necessary corrections in the Hindi Title and the draft document as discussed |
------- | |
7 | WC Draft | 07-12-2023 | Duration : 60 Days Submitted for HOD approval Remarks : Corrections have been made submitted for kind approval for wide circulation |
------- | |
8 | WC Draft | 08-12-2023 | WC approved by HOD |
TEDC TED 02, | ------- |