Name of Department/Committee : | CHD 10 | ||||
---|---|---|---|---|---|
Document Number : | CHD 10 ( 20852) | ||||
Document Title [English] : | Baume Hydrometer - Specification First Revision | ||||
Document Title [Hindi] : | बॉम हाइड्रोमीटर – विशिष्टि (पहला पुनरीक्षण ) | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 17.060 | ||||
Date of Project Approval : | 29-07-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Chemical Products |
Sub Sub Group : | Laboratory glassware and test methods |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | Baume Hydrometer |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : |
|
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
1 | IS 1382: 1981 | Glossary of terms relating to glass and glassware (First Revision) | |
2 | IS 3104 : Part 1: 1982 | Specification for density hydrometers: Part 1 requirements (First Revision) | |
3 | IS 4825: 1982 | Specification for liquid - In - Glass solid - Stem reference thermometers (first revision) | |
4 | IS 5717: 2003 | Laboratory glassware - Pyknometers (Second Revision) |
Sl.No. | Synosis Points | |
1 | This standard was first published in 1988. This revision is being undertaken, in view of advancements in technology and improvement in the accuracy of Hydrometers available in the market. In this revision following changes have been made: 1) Existing standard covers Hydrometer for only liquid heavier than water however Baume Hydrometers are also commonly used for measuring the density of liquids lighter than water. In this revision hydrometers for liquids lighter than water are also covered. 2) Dimensions of hydrometers like length and diameter have been modified to accommodate hydrometers of higher accuracy/least count. 3) Marking details have been modified. The explanatory note has been modified. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 29-07-2022 | ------- | ||
2 | P-Draft Waived | 17-10-2022 | ARP already circulated through the portal for 21 days. | ------- | |
3 | WC Draft | 17-10-2022 | Duration : 60 Days Submitted for HOD approval |
------- | |
4 | WC Draft | 17-10-2022 | WC approved by HOD |
CHDC | ------- |
5 | Skipped to Finalization | 20-12-2024 | Stage-Changed | ------- | |
6 | Finalization | 20-12-2024 | ------ | ------- | |
7 | Final Draft | 20-12-2024 | Submited for HOD approval Remarks: Finalized in the 25th meeting of CHD 10 |
------- | |
8 | Final Draft Rejected by HOD | 26-12-2024 | Final Draft rejected by HOD Remarks: Please check Committee composition. |
------- | |
9 | Final Draft | 01-01-2025 | Submited for HOD approval Remarks: Committee composition updated |
------- | |
10 | Final Draft draft accepted by HOD and sent to Publication | 02-01-2025 | Final Draft approved by HOD | ------- | |
11 | Accepted by Publication | 07-01-2025 | Final Draft accepted by Publication Remarks: Accepted by Publication |
------- | |
12 | Proof sent to Technical Department | 08-01-2025 | प्रथम एडिटिड कॉपी संलग्न है | ------- | |
13 | Proof sent to Publication | 25-02-2025 | The attached proof document is ok. Please send the pdf file. | ------- | |
14 | Proof sent to Technical Department | 03-03-2025 | डी सी चेयरपर्सन के अप्रूवल एवं गज़ेट डिटेल्स हेतु पी डी एफ फॉर्मैट संलग्न है । | ------- |