Document Details |
|||||
Name of Department/Committee : | CHD 01 | ||||
---|---|---|---|---|---|
Document Number : | CHD 01 ( 20841) | ||||
Document Title [English] : | TRISODIUM PHOSPHATE SPECIFICATION | ||||
Document Title [Hindi] : | ट्राइसोडियम फॉस्फेट — विशिष्टि | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 2 | ||||
ICS Code : | 71.060.50 | ||||
Date of Project Approval : | 12-10-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Chemicals, Plastics and their Products including packaging and Environment |
Sub Group : | Chemicals |
Sub Sub Group : | General Industrial Chemiclas |
Aspects : | Product Specification |
Risk : | None |
Certification : | Voluntary Certification |
Short Commom Man's Title : | |
ITCHS Code : | |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Division Council Chairperson Approval Details |
|||||||||||
|
::Cross Referenced Indian Standard:: |
|||
Sl. No. | Is No & Year | IS Title | |
1 | IS 264: 2005 | Nitric acid - Specification (Third Revision) | |
2 | IS 265: 2021 | HYDROCHLORIC ACID SPECIFICATION Fifth Revision | |
3 | IS 915: 2012 | Laboratory glassware - One - Mark volumetric flasks (Third Revision) | |
4 | IS 1070: 1992 | Reagent grade water - Specification (Third Revision) | |
5 | IS 2088: 1983 | Methods for determination of arsenic (Second Revision) | |
6 | IS 2263: 1979 | Methods of preparation of indicator solutions (First Revision) | |
7 | IS 2316: 1990 | Methods of preparation of standard solutions for colorimetric and volumetric analysis (Second Revision) | |
8 | IS 3025 : Part 2: 2019 | Methods of Sampling and Test (Physical and Chemical) for Water and Wastewater: Part 2 Determination of Selected Elements by Inductively Coupled Plasma Optical Emission Spectrometry (ICP - OES) (First Revision) | |
9 | IS 4905: 2015 | Random sampling and randomization procedures (First Revision) |
Sl.No. | Synosis Points | |
1 | This standard prescribes requirements and methods of sampling and test for trisodium phosphate.In this revision, instrumental test methods for the determination of arsenic, chlorides, lead and sulphates have been added as alternate test methods. Also, Packing and Marking clause has been updated. Further, all the amendment have been incorporated. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 12-10-2022 | ------- | ||
2 | P-Draft Waived | 17-10-2022 | ------- | ||
3 | WC Draft | 17-10-2022 | Duration : 60 Days Submitted for HOD approval Remarks : Committee decided to send the document for Wide Circulation in its meeting held on 12102022 Put up for approval please |
------- | |
4 | WC Draft | 17-10-2022 | WC approved by HOD |
CHDC CHD 01, | ------- |
5 | Skipped to Finalization | 23-03-2023 | Stage-Changed | ------- | |
6 | Finalization | 15-03-2023 | ------ | ------- | |
7 | Final Draft | 23-03-2023 | Submited for HOD approval Remarks: The Committee in its meeting held on 15th March 2023 decided to send the document for Printing |
------- | |
8 | Final Draft Rejected by HOD | 31-03-2023 | Final Draft rejected by HOD Remarks: Please check the title and contents of the standard |
------- | |
9 | Final Draft | 11-04-2023 | Submited for HOD approval Remarks: Document put up again please after incorporating the necessary corrections |
------- | |
10 | Final Draft draft accepted by HOD and sent to Publication | 17-04-2023 | Final Draft approved by HOD | ------- | |
11 | Accepted by Publication | 24-04-2023 | Final Draft accepted by Publication Remarks: Accepted by Publication |
------- | |
12 | Proof sent by OSA to Publication | 01-06-2023 | Proof to OSA Stage-Skipped | ------- | |
13 | Proof sent to Technical Department | 01-06-2023 | प्रथम एडिटिड कॉपी संलग्न है | ------- | |
14 | Proof sent to Publication | 05-06-2023 | The document has been checked and corrections marked in it for perusal of Publication department please. | ------- | |
15 | Proof sent by OSA to Publication | 07-06-2023 | Proof to OSA Stage-Skipped | ------- | |
16 | Skipped to Pdf Stage | 07-06-2023 | Proof to Technial Department Stage-Skipped | ------- | |
17 | Stage-Skipped | 07-06-2023 | PDF to OSA Stage-Skipped | ------- | |
18 | Pdf sent by Publication to Technical Department | 07-06-2023 | PDF attached, Please provide chairperson approval and gazette details. | ------- | |
19 | Pdf sent by Technical Department to Publication | 09-06-2023 | The document has been checked and corrections marked for perusal of Publication dept please. | ------- | |
20 | Stage-Skipped | 27-06-2023 | PDF to OSA Stage-Skipped | ------- | |
21 | Pdf sent by Publication to Technical Department | 27-06-2023 | Corrections done, please provide chairperson approval and gazette details. | ------- | |
22 | Pdf sent by Technical Department to Publication | 27-06-2023 | The document is found in order please. | ------- | |
23 | Ready for Gazette | 27-06-2023 | Stage-Changed | ------- |