Document Details |
|||||
Name of Department/Committee : | MTD 03 | ||||
---|---|---|---|---|---|
Document Number : | MTD 03 ( 20807) | ||||
Document Title [English] : | Method for upsetting test on metallic materials | ||||
Document Title [Hindi] : | धात्विक सामग्रियों पर स्थूलन परीक्षण की विधि | ||||
Document Type : | Revision | ||||
Language : | English | ||||
Priority : | 3 | ||||
ICS Code : | 77.040.10 | ||||
Date of Project Approval : | 13-10-2022 | ||||
Standards to be Revised : |
|
||||
Standards to be Superseded : |
|
Classification Details |
|
Group : | Metals, Alloys and Metal Products (including Steel Products) |
Sub Group : | Heat treatment, metallography and testing |
Sub Sub Group : | Methods of mechanical testing of metals |
Aspects : | Methods of tests |
Risk : | None |
Certification : | None |
Short Commom Man's Title : | Method for upsetting test on metallic materials |
ITCHS Code : | NA |
Ministry : |
|
Sustainable development Goals : | |
Degree of Equivalence : | Indigenous |
Identical/Equivalent Standards : | |
Organization Type: |
Sl.No. | Synosis Points | |
1 | This standard was first published in 1993 to establish a uniform procedure for conducting the upsetting test on metallic materials. This test is generally carried out on finished products (bars, rods, etc) for determining the surface quality of the material, and is also sometimes known as the ‘Dump Test ‘. Certain requirements have to be specified in the material specification where reference has been made to this standard. For convenience of reference, these requirements have been summarized and included in Annex A. This revision (first revision) has been undertaken to update the requirements of test specimen and inclusion of test report in the standard. |
Timeline Details |
|||||||
|
|||||||
|
|||||||
|
|||||||
Stages |
|||||
Sl. No. |
Stage | Date of Occurence | Remarks | Circulated to | Files |
1 | Generation of Document Number | 13-10-2022 | ------- | ||
2 | P-Draft | 17-10-2022 | Covering letter generated | ------- | |
3 | P-Draft | 17-10-2022 | Duration : 21 Days Remarks : Working draft of IS 10167 |
MTD 3, | ------- |
4 | Skipped to W-Draft | 08-12-2023 | Stage-Changed | ------- | |
5 | WC Draft | 08-12-2023 | Duration : 30 Days Submitted for HOD approval |
------- | |
6 | WC Draft | 08-12-2023 | WC approved by HOD |
MTDC | ------- |